Similar Projects
Little Rock Pond - City of Charlotte
Infrastructure
Conception
$1,100,000 est. value
Charlotte, NC 28263

Lot Cleaning 5329 Rodwell Road
Demolition, Infrastructure
Sub-Bidding
$70,000 CJ est. value
Fayetteville, NC 28311

The Arbors at South Crossing - Demolition Bid Set
Demolition, Infrastructure
Sub-Bidding
$50,000 CJ est. value
Greensboro, NC 27406

Asbestos, Lead And Radon Assessment
Post-Bid
NC

Environmental Services to Support the City of Hendersonville Mud Creek Interceptor Replacement Project
Post-Bid
Hendersonville, NC

Lead Based Paint Testing and Asbestos Testing Services Pursuant
Results
Carthage, NC

Lead and Asbestos Sample Collection & Testing
Results
Cherry Point, NC

Demolition, Lot Cleaning and Asbestos Abatement
Term Contract, Demolition, Infrastructure
Sub-Bidding
$60,000 CJ est. value
East Fayetteville, NC 28301

Demolition and Clearance of Structures, Including Asbestos Removal, On Two Properties
Post-Bid
Kinston, NC 28504

Lot Clearing, Asbestos Abatement, and Demolition
Demolition
Results
Fayetteville, NC 28301

Subm Transformers
Term Contract
Sub-Bidding
High Point, NC 27260

Environmental Cleanup Program Support
Term Contract
Post-Bid
Fort Rucker, Redstone Arsenal, AL - Fort Gordon, GA - Fort Campbell, Fort Knox, KY - Fort Bragg, NC

Lot Clearing, Asbestos Abatement and Demolition
Demolition
Results
Fayetteville, NC 28303

Unspecified Tree Pruning Arborist
Term Contract
Sub-Bidding
Charlotte, NC 28202

Emergency Mitigation Clean-Up Services
Alteration
Post-Bid
Charlotte, NC

Last Updated 08/22/2022 06:31 PM
Project Title

Water Treatment Plant Demolition

Physical Address View project details and contacts
City, State (County) Maiden, NC 28650   (Catawba County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $280,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the full above-grade demolition of the abandoned water treatment plant on the corner of Water Plant Rd and Providence Mill Rd. in Maiden, NC. Any project related questions or RFI's shall be directed to Kara Hrkach (kara.hrkach@kci.com). A certified check or bank draft, pay to the order of Town of Maiden, North Carolina, negotiable U.S. Government bonds (at par value), or a satisfactory Bid Bond executed by the Bidder and an accepted Surety, in an amount equal to five percent (5%) of the total of the Bid shall be submitted with each bid. The Work will be substantially completed within 60 days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 75 days after the date when the Contract Times commence to run.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents