Similar Projects
Commercial Storage Facility
New Construction - 34,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Sister Bay, WI 54234

Multi-Tenant Commercial Building - Storage Units
New Construction - 46,080 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Caledonia, WI

City Hall Renovation and Garage
New Construction, Renovation
Post-Bid
Arcadia, WI 54612

Cold Storage Shed
New Construction
Post-Bid
Richland Center, WI 53581

Pole Barn Insulation
Results
Pewaukee, WI 53072

2020 Sludge Storage Building
Results
Wisconsin Rapids, WI 54495

Thiele Heating & Air Conditioning
New Construction - 4,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Beloit, WI 53511

Fedex #0436
Addition
Construction
Wauwatosa, WI 53226

Business Park - HSA Franklin
New Construction - 297,626 SF
Pending Verification
$64,000,000 est. value
Franklin, WI

Business Park - HSA Franklin
New Construction - 297,626 SF
Pending Verification
$64,000,000 est. value
Franklin, WI

Extra Space Climate Controlled Self Storage Facility
Renovation, Addition - 217,305 SF
Post-Bid
$10,000,000 CJ est. value
Middleton, WI 53562

Sand / Salt Shed
Results
Plum City, WI 54560

Proposed Storage Building
New Construction
Pending Verification
West Bend, WI 53095

Sheriff's Office Storage Building
New Construction
Post-Bid
Lake Mills, WI 53551

Chippewa Falls Commodities Building
Results
Less than $78,750 est. value
Chippewa Falls, WI 54729

Reported 04/08/2021 03:26 PM
Project Title

Redevelopment Construction Of A Climate Controlled Self-Storage Facility

Physical Address View project details and contacts
City, State (County) Brookfield, WI 53005   (Waukesha County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Bids by Invitation.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Warehouse/Storage, 43,000 SF New Construction, Building.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents