Similar Projects
UW Superior - ESPC - 1 MW Solar Array - University of Wisconsin System - Administration
Infrastructure
Design
$1,651,000 est. value
Superior, WI

Hayward - Brule Construction / Bridge Replacement
Demolition, New Construction, Infrastructure
Design
$750,000 CJ est. value
Solon Springs, WI 54873

Hazel Prairie Gravel and Pulverize
Infrastructure
Bidding
$50,000 CJ est. value
Lake Nebagamon, WI 54849

Hazel Prairie Gravel and Pulverize
Infrastructure
Bidding
$50,000 CJ est. value
Lake Nebagamon, WI 54849

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Poly Fiber Flex Patch
Infrastructure
Post-Bid
Gordon, Minong, WI 54859

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Brule - Ino, Sznaider Road to CTH A; Wentworth - Ino, Clevedon Road to Sznaider Road;
Infrastructure
Results
$100,000 est. value

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Francis Willard Road Gravel and Pulverize
Infrastructure
Bidding
$50,000 CJ est. value
Lake Nebagamon, WI 54849

Scrub Seal with Fog Seal over Asphalt Road
Infrastructure
Post-Bid
Gordon, Minong, WI 54838

Barker's Island SOGL Site Improvements Project
Infrastructure
Results
$1,342,025 CJ est. value
Superior, WI 54880

Hazel Prairie Repavement
Infrastructure
Bidding
$1,000,000 CJ est. value
Lake Nebagamon, WI 54849

2022-23 Blacktop Resurfacing - Hot Mix Bond Leader Lake Road to Leader Lake Road
Infrastructure
Post-Bid
Minong, WI 54859

Last Updated 02/04/2023 10:34 AM
Project Title

N 28th St & Tower Avenue Sanitary Sewer Replacement

Physical Address View project details and contacts
City, State (County) Superior, WI 54880   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $57,232 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract shall consist of removing approximately 42 LF of 8-inch sanitary sewer, installing approximately 42LF of 8-inch PVC sanitary sewer, reconnecting two (2) service laterals, removing three (3) precast concrete manholes, installing three (3) precast concrete manholes, site restoration including asphalt pavement, concrete sidewalk, 30-Inch concrete curb and gutter, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. Bid Bond 5% Plan (blueprint) Electronic plan documents eBidding No Deadline for questions is Monday, January 23rd , 2023, at 12:00pm. All questions should be emailed to the City of Superior ESD at: pollockdavid@ci.superior.wi.us.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents