Similar Projects
Cornucopia - Port Wing Construction / Culvert Replacement
Infrastructure
Conception
$2,000,000 CJ est. value
Ashland, WI 54806

Durand - Mondovi Construction / Resurface
Infrastructure
Conception
$3,000,000 CJ est. value
Alma, WI 54610

C Rice Lake, Hammond Avenue Const / Misc / Culvert Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Cumberland, WI 54829

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

A New Fire Station
New Construction, Infrastructure
Bidding
$1,200,000 CJ est. value
Chilton, WI 53014

Odanah - Saxon, Government Road to East County Line
Infrastructure
Bidding
$5,000,000 CJ est. value
Ashland, WI 54806

Chilton New Stadium and Elementary School Addition and Renovations
Addition, Demolition, New Construction, Build-out, Infrastructure - 45,414 SF
Sub-Bidding
$4,000,000 CJ est. value
Chilton, WI 53014

Chambers Hill Farm 1st Addition Roadway
Post-Bid
Suamico, WI

Osmosis Plant at the Calumet County Park
New Construction
Post-Bid
Hilbert, WI 54129

Odden Road and Odden Lane Improvements
Infrastructure
Results
Barronett, WI

Wastewater Treatment Plant
New Construction
Results
Mondovi, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Roadway Repaving Lake Wissota State Park
Infrastructure
Pending Verification
$727,350 CJ est. value
Chippewa Falls, WI 54729

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

Last Updated 11/23/2022 10:34 AM
Project Title

Proposed UV Disinfection Upgrade - Wastewater Treatment Facility

Physical Address View project details and contacts
City, State (County) Shullsburg, WI 53586   (Lafayette County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $138,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Contact City Description of Work: The Project consists of wastewater process piping, concrete channel, electrical, ultraviolet disinfection system, erosion control, landscaping, and all associated equipment and appurtenances at the Wastewater Treatment Facility site. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. Additional Conditions: The letting of the work described herein is subject to the provisions of Sections 62.15, 66.0901, and 66.0903(1m) of the Wisconsin Statutes. There are no prevailing wage rates for this Project. The City encourages Minority-owned Business Enterprises (MBE's), Women's Business Enterprises (WBE's), Disadvantaged Business Enterprises (DBE's), and Small Businesses in Rural Areas (SBRA's) to submit bids. A municipality, in awarding prime contracts, and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of participation for MBE/WBE utilization in accordance with s.NR 162.09(3), Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least five percent (5%) of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the Bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the Bidder as soon as the contract is signed. If after 15 days the Bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. BIDDER is required to deliver the original certified check, bank money order, or bid bond within 72 hours of bid opening to Delta 3 Engineering, Inc., Attn: Ms. Jamie Marcue, 875 S. Chestnut Street, Platteville, Wisconsin 53818 Bids may not be withdrawn within 90 days after the date of the bid opening. The OWNER reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work, as may be deemed necessary by the OWNER, and the same shall in no way affect or make void the contract, except that additions to, or deductions from, the contract price will be appropriately made. The OWNER reserves the right to waive any informalities, or to reject any or all bids, or any part of a bid, and to award the Contract to the Bidder, who in the judgment of the OWNER, will best serve the interest of the OWNER. Completion Date: June 9, 2023

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents