Last Updated | 10/13/2023 07:01 AM |
Project Title | KC-46A Kitting Facility at Tinker Air Force Base |
Physical Address | View project details and contacts |
City, State (County) | Tulsa, OK 74137 (Tulsa County) |
Category(s) | Heavy and Highway, Sewer and Water, Transportation |
Sub-Category(s) | Aircraft Hangar, Paving/Reconstruction, Runways/Taxiways, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $25,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate - 08/29/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Description: This project will be a design-bid-build construction project for an approximately 40,000 square foot kitting facility that is primarily warehouse space, but also includes ancillary administrative and support spaces. This facility will be standalone and consists of a panel shop, kitting build up area, kitting repair area, kitting system area, inventory area, drop off area, administrative area, restrooms, and utility rooms. Exterior design will match the adjacent hangars and will consist of metal roof panels and metal wall panels with brick wainscot. This project also includes clearing and grading , storm drainage, aircraft parking/movement area, utility infrastructure systems, and other supporting facilities. Facilities will be designed as permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01. In accordance with DFARS 236.204, Disclosure of the of Construction Projects, the estimated of construction for this project is between $10,000,000 and $25,000,000. The North American Industry Classification System code for this procurement is 236220, which has a small business size standard of $45M. This requirement will be solicited as Unrestricted. Estimated of construction of this project is 365 calendar days. Anticipated solicitation issuance date is on or about 29 August 2023, and the estimated proposal due date will be on or about 16 October 2023. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||
Details | 40,000 SF.
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |