Similar Projects
Last Updated | 05/26/2021 02:55 PM |
Project Title | CPS Manierre ES Parking Lot Repair |
Physical Address | View project details and contacts |
City, State (County) | Chicago, IL 60610 (Cook County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide Labor and Materials to: 1)Replace asphalt pavement with asphalt pavement on the side parking lot leading to the dumpster area. 2)Asphalt a)Excavate area leading to parking lot/trash/dumpster area and pour new asphalt. b)Approx. 4,400 sq. ft. c)Perform milling of 2” thick surface course and replacing it with 2” new surface. d)Contractor to remove existing asphalt and haul away. e)Add CA-6 stone as needed to provide proper pitch and drainage. f)Match existing parking lot layout with striping. 3)Contractor to ensure that slopes exist to maintain proper drainage pattern. 4)Move parking stops as needed to perform work and put them back in place when work is completed. 5)Contractor to field verify dimensions and specifics of all before placing bid. 6)Not responsible for contractor errors as a result of non-field verification. 7)Materials and installation must comply with CPS Standards and Specifications as listed on i)32 12 16 ASPHALT PAVING ii)31 23 23 ACCEPTANCE OF BACKFILL, TOP SOIL & CU STRUCTURAL SOIL 8)Secure job site overnight if work is not completed in one day. 9)If building or CPS properties are damaged during construction, replace and/or repair as necessary. 10)All questions/requests must be received 2 business days, prior to bid closing. 11)All work shall be coordinated with the Board authorized representative to complete in an agreed upon timeframe. 12)Clean the surrounding area and make sure all is swept of debris and excess mortar. 13)All trash must be removed offsite by vendor and area left clean. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |