Similar Projects
Sanitary Sewer System Improvements
Infrastructure
Bidding
$450,000 est. value
Odum, GA

On-Call Geotechnical Drilling Services
Infrastructure
Bidding
Atlanta, GA

Warner Range Potable Water Well
Post-Bid
Columbus, GA 31901

Pearl Street Well Replacement
Post-Bid
Shellman, GA

2020 Water System Improvements - Andrews Well 2
Results
Carnesville, GA 30521

F. Wayne Hill Water Resources Center (WRC) Backwash Waste Pump Replacement
Results
Buford, GA 30519

Bypass Pumping Services on an Annual Contract
Term Contract
Post-Bid
GA

Booster Pump & Water System Improvements
Results
$328,000 est. value
Georgetown, GA

Water Softening System
Infrastructure
Post-Bid
Mount Vernon, GA

Fire Pumps and DW Pumps Maintenance and Repair
Term Contract
Results
Atlanta, GA 30303

Drinking Water Filteration System
Renovation, Infrastructure
Post-Bid
Waynesboro, GA

Buddy Spann Park Well No. 5 (105)
Results
Hazlehurst, GA

Well Inspection and Pipe Modification
Infrastructure
Post-Bid
Pembroke, GA

New 30,000 Gallon Draft Pit
Results
Valdosta, GA 31606

Municipal Non-Potable Irrigation Well Drilling Service
Infrastructure
Post-Bid
Clarkston, GA

Last Updated 07/27/2022 12:24 AM
Project Title

Wet Well Cleaning Services - Three (3) Year Multiyear Contract

Physical Address View project details and contacts
City, State (County) Stonecrest, GA 30038   (DeKalb County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022,
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Removal and Disposal - The Contractor will provide vacuuming / removal services to remove the accumulated grit and materials from the Polebridge wet well. The expected area of the two open air wet wells and two covered wet wells is calculated to equal 1728 square feet. The depth of material is estimated at 3 feet. The Contractor will dewater the material before transporting the material to the DeKalb County Seminole Landfill for disposal. The Contractor must follow all OSHA safety protocols for all services provided, and in accordance with the Scope of Services.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents