Similar Projects
WPCP Digester Feed & Piping Improvements
Bidding
Fort Wayne, IN

New Water Treatment Plant and Well No. 5
Bidding
Lagrange, IN 46761

Monroe WTP Residuals Pumping Improvements
Post-Bid
Bloomington, IN 47401

Grit Dewatering Improvements
Post-Bid
Gary, IN 46401

Wastewater Treatment Plant Improvements
Results
Bedford, IN 47421

Wastewater System Improvements and Septic Relief
Results
Huntington, IN 46750

Virgin Granular Activated Carbon
Post-Bid
Hammond, IN

WWTP Clarifier Rehabilitation
New Construction, Demolition
Results
South Bend, IN 46601

2020 Wastewater Treatment Improvements
Post-Bid
Glenwood, IN

Water Pollution Control Plant Trim Blower Improvements
Results
Fort Wayne, IN

Jasper Regional Water District (NORWEJ) Water Supply and Treatment Plant No. 2
Post-Bid
DeMotte, IN 46310

WPCP Dechlorination Injection Improvements
Results
Fort Wayne, IN 46803

Indiana Harbor and Canal Confined Disposal Facility Wastewater Treatment Plant
Post-Bid
$1,000,000 to $5,000,000 est. value
East Chicago, IN 46394

Wastewater System Improvements
Results
$851,000 est. value
Terre Haute, IN 47876

Butler WWTP Upgrades
Post-Bid
Butler, IN 46721

Last Updated 01/06/2021 07:32 AM
Project Title

Aqua Avon WWTP Expansion Phase VI

Physical Address View project details and contacts
City, State (County) Avon, IN 46123   (Hendricks County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status All Sub-Bids Received
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

Work for the project consists of the following: 1. Contractor shall properly disposal of the waste generated from the construction activities and other waste that may be generated during modifications of the existing structures in according to applicable Federal, State, and Local regulations. 2. Demolition 3. Headworks 4. Influent Splitter Box 5. New VLR Tanks 6. Modification of existing aerations tank effluent as shown in the contract documents 7. Clarifier Splitter Box 8. Clarifier 9. UV/Post Aeration 10. Chemical System 11. Installation of a new effluent automatic sampler suitable for outdoor installation with associated piping, valves, electrical, instrumentation and controls, and SCADA work 12. Sludge Holding Tanks 13. Plant Water System 14. Replace the existing emergency generator with a new emergency generator, and all associated electrical and related Work. 15. All other related Work as shown in the Contract Documents for a completed operational WWTP.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents