Last Updated 05/13/2020 06:39 AM
Project Title

Rehabilitation - York County

Physical Address View project details and contacts
City, State (County) SC   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance And Flagging 001 1.000 Ls Removal & Disposal Of Existing Pavement 797.000 Sy Removal & Disposal Of Existing Curb 810.000 Lf Removal & Disposal Of Existing Concrete 13.500 Cy Unclassified Excavation 5,273.500 Cy Borrow Excavation 902.000 Cy Cement Modified Recycled Base (8" Unif)-Curing Method a 47,253.000 Sy Cement Modified Recycled Base (10" Unif)-Curing Method b 11,400.000 Sy Portland Cement For Cement Modified Recycled Base Course 2,004.480 Ton Maintenance Stone 340.000 Ton Hot Mix Asphalt Base Course - Type b 3,935.146 Ton Liquid Asphalt Binder Pg64-22 842.138 Ton Full Depth Asph. Pav. Patching 8" Unif 850.000 Sy Milling Existing Asphalt Pavement 1.75" 13,361.000 Sy Milling Existing Asphalt Pavement 2.0" 12,038.000 Sy Milling Existing Asphalt Pavement (Variable) 4,196.000 Sy Hot Mix Asphalt Surface Course Type b 1,481.403 Ton Hot Mix Asphalt Surface Course Type c 6,455.537 Ton Hot Mix Asphalt Surface Course Type e 2,426.240 Ton Driveway Paving-Surface Type c 1,131.625 Ton Asphalt Surface Treatment(Single Treatment) 11,338.000 Sy Roller Compacted Concrete Pavement - 9" Uniform 11,811.000 Sy Portland Cement Concrete (Special Use) 250.000 Cy Permanent Construction Signs (Ground Mounted) 3,454.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 2,188.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 117,581.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 2,290.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 2,648.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 12.000 Ea White Word Message "Only"-Fast Dry Paint 12.000 Ea 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 178,146.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 1,476.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 49,430.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 1,170.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 1,401.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 6.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 6.000 Ea 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 154,571.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 65.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 452.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 60.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 1,840.000 Lf Sawcut For Loop Detector 750.000 Lf Adjust Catch Basin 8.000 Ea Concrete Curb And Gutter(1`-6") Vertical Face 470.000 Lf Concrete Curb And Gutter(2`-0") Vertical Face 340.000 Lf Concrete Sidewalk(4" Uniform) 23.000 Sy Detectable Warning Material 324.000 Sf Pedestrian Ramp Construction 750.000 Sy Permanent Grassing For Non-Permitted Resurfacing Projects 4.160 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents