Similar Projects
Skiff Point
New Construction
Design
Clearwater, FL 33767

Replace Sandfly Dock
Alteration
Bidding
$100,000 to $250,000 est. value
Homestead, FL

Grampell Drive Bulkhead Improvements
Infrastructure
Bidding
Jacksonville, FL 32221

MRD - 12Nov2020 - Installation of Waterways Signs, Lights and Pilings
Post-Bid
FL

Repairs to East Side of Pier Railing
Post-Bid
Deerfield Beach, FL 33441

Repair Waterfront and Storm Sewer Systems at U.S. Coast Guard Station Panama City, FL
Results
$500,000 to $1,000,000 est. value
Panama City, FL 32408

Lignumvitae Key Botanical State Park - Repair and Renovate Dock
Results
Islamorada, FL 33036

The Wharf
New Construction - 11,982 SF
Construction
$965,056 est. value
Saint Augustine, FL 32084

Latitude Margaritaville Watersound Amenities, Phase 1 & 2
New Construction - 34,862 SF
Construction
$30,000,000 est. value
WaterSound, FL

Perdido Key State Park - Building and Structure Repair
Renovation
Bidding
$840,000 est. value
Pensacola, FL 32507

Depot Facility Bulkhead Repairs
Post-Bid
$1,000,000 to $2,000,000 est. value
Jacksonville, FL

F--Debris Removal from FlL Bay and Ever
Results
Everglades, FL

Bay Point Marina
New Construction, Infrastructure
Construction
$10,000,000 est. value
Panama City, FL

Stephen Foster Folk Culture Center State Park - Canoe Launch Renovation
Infrastructure
Bidding
White Springs, FL 32096

Howey Fishing Pier Renovation Project
Infrastructure
Post-Bid
Howey in the Hills, FL

Last Updated 01/24/2022 08:49 AM
Project Title

Shands Pier Removal Project

Physical Address View project details and contacts
City, State (County) Green Cove Springs, FL 32043   (Clay County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Deconstruct and remove all material from the Shands Pier back to the bulkhead of the embankment due to the severe damage caused by Hurricane Matthew. The contractor will be required to remove approximately 1500’ of remaining pile sets below the surface, timber framing, and asphalt coated decking of the storm damaged pier. The remaining asphalt coated decking portion is approximately 370’ long.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents