Similar Projects
Pavement Patching on the I-90 Southbound off Ramp at IL 75
Infrastructure
Bidding
IL

Replace 2 Box Culverts Carrying Gleasman Road Over Unnamed Creeks 0.80 Mile West of IL2, and 1/70 Miles East of IL 2
Infrastructure
Bidding
$500,000 est. value
IL

Central Division - Asphalt Paving Maintenance
Post-Bid

F.O.B. Co./Twp. Yard: Var. Pipe Culverts, Connect Bands, End Sections
Post-Bid
IL

Sidewalk Replacement, New Sidewalks, Lighting Improvements, Streetscaping and Landscaping
Results
Durand, IL 61024

Gregory Heights Drainage Improvements Phase 1
Results
Less than $538,328 est. value
Rockford, IL 61104

Placing Various Widths of Modified Urethane and Thermoplastic Pavement Marking Lines, Letters and Symbols
Infrastructure
Bidding
$200,000 est. value

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

City Hall Sidewalks, ADA, and Drainage Improvements
Results
Less than $76,000 est. value
Rockford, IL

East High School Student Parking Lot Improvements
Infrastructure
Bidding
$200,000 est. value
Rockford, IL 61108

Haskell School Parking Lot Replacement
Post-Bid
Rockford, IL 61103

Alpine Road Improvements - Storm Sewer Clean and Televise
Results
Less than $165,989 est. value
Machesney Park, IL

Harlem Road Improvements
Infrastructure
Bidding
$178,000 est. value
Machesney Park, IL 61115

Hot-Mix Asphalt Patching FY 2022
Term Contract
Post-Bid
Less than $400,000 est. value
Rockford, IL

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

Last Updated 04/27/2022 12:29 PM
Project Title

Hononegah High School Bus Lane Reconstruction

Physical Address View project details and contacts
City, State (County) Rockton, IL 61072   (Winnebago County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work will include the removal and installation of HMA pavement, sidewalk removal and replacement, curb & gutter removal and replacement, storm sewer removal and replacement, and restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents