Similar Projects
Brown Alley Drainage Remediation Project
Infrastructure
Bidding
Lewisburg, PA

Malin Road Culvert Replacement
Infrastructure
Bidding
Newtown Square, PA 19073

Dura-Hold Retaining Wall Units
Post-Bid
Pittsburgh, PA 15219

Mass Earthwork Plan - South Fayette Municipal Complex Project - Phase 1
Post-Bid
Bridgeville, PA 15017

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Riverview Avenue Slope Repair
Post-Bid
Pittsburgh, PA 15214

Laurel Lake Road
Results
Columbia Cross Roads, PA 16914

Mattes Road Culvert Replacement
Post-Bid
Friendsville, PA 18818

Mchenry Road Culvert Project
Results
Benton, PA 17814

Roberts Road Culvert Replacement Project
Post-Bid
Littlestown, PA 17340

Upper Julian Pike and Rose Drive Culvert Replacements Project
Results
$55,000 to $75,000 est. value
Patton, PA 16803

Airfield Drainage Improvements at Allegheny County Airport
Post-Bid
West Mifflin, PA 15122

Precast Concrete Basins, Risers, Grates and Frames
Results
PA

Mountain Road Culvert Project
Post-Bid
Less than $105,000 est. value
Benton, PA 17814

Last Updated 02/14/2022 10:35 AM
Project Title

Swatara Creek Bank Stabilization and Gravel Bar Removal Project

Physical Address View project details and contacts
City, State (County) Pine Grove, PA   (Schuylkill County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency - 09/08/21
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes installation of boulders for bank stabilization and fish habitat and removal of a gravel bar within the Swatara Creek. The project area is located in Pine Grove Borough and Pine Grove Township, Schuylkill County, Pennsylvania. Work will involve placing the rock structures within the stream channel, removing the gravel bar from the site, erosion and sediment control plan implementation, and planting the site with native vegetation. All fill materials will be disposed of out of the floodplain and out of any wetlands.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents