Similar Projects
Tree Removal And Pruning
Infrastructure
Bidding
Stillwater, NY

Site Clearing and Vegetation Control
Term Contract
Post-Bid
Rush, NY 14543

Cutting, Trimming and Topping of Trees
Term Contract
Post-Bid
Utica, NY 13501

Rapid Response 6 Environmental Remediation Services
Results
Less than $80,000,000 est. value

Rapid Response 6 Environmental Remediation Services
Results
Less than $80,000,000 est. value

Herbicide / Weed Control Services for the Parks Department
Term Contract
Post-Bid
Yonkers, NY 10701

Reconstruct Plaza - Donovan Hall and Replace Wildcat Pedestrian Bridge at SUNY Polytechnic Institute
Renovation
Results
$2,500,000 to $5,000,000 est. value
Schuyler, Utica, NY 13502

Tree Trimming
Post-Bid
Auburn, NY

Jamestown Community College - North Union Street Entrance Wall
Results
Less than $150,000 est. value
Olean, NY 14760

Maider Road Waterfront Site Environmental Restoration Project Clay
Post-Bid
Clay, NY 13041

Control and Maintenance of Roadside Vegetation
Results
Lockport, NY 14094

Environmental Remediation Services (ERS)
Term Contract
Post-Bid

Mowing and Litter Removal Along the Palisades Interstate Parkway and Route 6
Results
Less than $380,000 est. value

Former Adirondack Steel Site Project
Alteration
Post-Bid
$5,000,000 to $10,000,000 est. value
NY

Baldwinsville Public Library Site Work
Results
Less than $300,000 est. value
Baldwinsville, NY 13027

Last Updated 09/09/2021 03:06 AM
Project Title

Habitat Restoration and Clean-Up

Physical Address View project details and contacts
City, State (County) Bay Shore, Shinnecock Hills, NY 11706   (Suffolk County)
Category(s) Environmental, Heavy and Highway
Sub-Category(s) Landscaping, Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The site shall be seeded with a native seed mix as described on the plan at a rate of 40 lbs. per acre. All plants shall be mulched using pine needle mulch. No mulch shall be used in seeded area. Proposal must include the removal and proper offsite disposal of all debris, brush and downed trees in the cleared area on the lot. The existing split rail fence along the southern lot line will be removed during site work and replaced in kind at the end of the project.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Wetlands, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents