Similar Projects
Green City Development
New Construction - 1,585,000 SF
Conception
Henrico, VA

Avenlea Mixed-Use Development
New Construction
Conception
Henrico, VA

GreenCity
New Construction - 2,497,000 SF
Design
$2,300,000,000 est. value
Richmond, VA

GreenCity
New Construction - 2,497,000 SF
Design
$2,300,000,000 est. value
Richmond, VA

Three Chopt Road Sidewalk Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Richmond, VA 23229

Elko Hub Communication Shelter Relocation
Infrastructure
Post-Bid
VA

Pouncey Tract Road Mixed-Use Development
New Construction - 19,700 SF
Post-Bid
$55,000,000 est. value
Glen Allen, VA 23059

Subgrade Stabilization
Infrastructure
Results

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Chamberlayne Avenue Multi-Family Housing Development
New Construction, Demolition - 114,007 SF
Construction
$6,782,276 est. value
Richmond, VA

Studios@6531
New Construction, Renovation - 50,000 SF
Construction
Richmond, VA 23230

Henrico Corporate Headquarters Redevelopment
Renovation, Addition
Pending Verification
Richmond, VA 23230

Short Pump Commercial Development
New Construction
Pending Verification
Henrico, VA

Greenhouse Section 1
New Construction
Conception
$11,000,000 est. value
Glen Allen, VA 23060

Old Three Chopt Road Apartments
New Construction - 435,486 SF
Design
$119,000,000 est. value
VA

Last Updated 09/14/2022 10:15 AM
Project Title

Brook Villas

Physical Address View project details and contacts
City, State (County) Richmond, VA 23228   (Henrico County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Office, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected December 2021
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the construction of one three-story, 36-unit, 41,037-square foot apartment building and two three story 24-unit, 30,075-square foot apartment buildings, with a 2,972-square foot, one-story clubhouse and maintenance building. As of September 14, 2022, construction is underway and is anticipated to be complete second quarter 2023.

Details

,, 44,009 SF - 3 Stories Above Grade, 41,037 SF. 3 Stories Above Grade, New Construction, New Construction. 2,972 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents