Similar Projects
Exterior Painting of a 2.4-Million-gallon Steel Water Tank
Renovation
Post-Bid
$150,000 CJ est. value
Canby, OR 97013

Rural Arterial Recessed Raised Pavement Markers Project
Infrastructure
Post-Bid
$326,400 CJ est. value
Oregon City, OR 97045

Abernathy Creek Bridge 2 Painting Project
Infrastructure
Post-Bid
$7,260,000 CJ est. value
West Linn, OR 97068

Exterior Painting of Office and Warehouse Buildings
Renovation
Results
$140,000 CJ est. value
North Bend, OR 97459

Lane County Armed Forces Reserve Center (AFRC) Exterior Painting and Sealing
Alteration
Results
$325,000 to $375,000 est. value
Springfield, OR 97477

2022 Signing and Striping Modifications, Various Locations
Infrastructure
Post-Bid
$75,000 CJ est. value
Eugene, OR 97401

Multi-Site Painting 2023 Package 1
Renovation
Results
$37,400 CJ est. value
Eugene, OR 97401

Multi-Site Painting 2023 - Package 2
Renovation
Results
$113,400 CJ est. value
Eugene, OR 97401

Oregon State Correctional Institution - Roofs, Paint and Recycle Buildings
Alteration
Post-Bid
$380,000 est. value
Salem, OR 97310

Painting Services
Term Contract
Post-Bid
Salem, OR

Regional Emergency Enhancement Project (REEP) and Armory Service Life Extension Project (ASLEP) - Bid Package 4
Renovation
Post-Bid
$80,000 CJ est. value
Salem, OR 97301

Painting Services
Term Contract
Post-Bid
$245,000 CJ est. value
Hillsboro, OR 97123

Last Updated 10/13/2023 05:06 PM
Project Title

NOAA MOC-P Facility Painting 2023

Physical Address View project details and contacts
City, State (County) Newport, OR 97365   (Lincoln County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $142,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

QUESTIONS TO: Jim Durkee 541-270-0545 Scope of Work: Provide all labor, materials, tools, lift equipment, supervision (min one company employed, full time foreman), submittals, manuals and incidentals necessary to complete all work implied by the attached scope of work you are quoting. Any deviations taken by bidder to the terms, conditions, plans, specifications, codes, etc of this RFQ shall be clearly stated and included as an attachment to the Bid Form. See Bid Form for add/alternate work if applicable General Description: Repainting of approximately 53,000sf at all common, office, and demised area gypsum board walls to match existing latex finish, 1 coating, per attached specification. Contractor to patch, repair, texture and prime damaged drywall, if any, within the scope of work as necessary. Removal and replacement of detachable items such as electrical plates, dry erase boards, wall hangings, movable furnishings and other items as necessary for a professional paint job. Schedule for Work: Start: TBD/November 2023 Completion: December 2023 Work to be performed after normal working hours between 5:00pm - 6:00am Mon - Fri and all hours on weekends. Time is of the essence. Contractor to provide estimated work duration and schedule. All attempts at improving the schedule will be made by the contractor Insurance: Upon acceptance, contractor will provide proof of proper business licensing and registration in Lincoln County, Oregon, and will maintain all required licensing and permits required by Local, State or Federal jurisdictions to perform the services of this agreement. Contractor will provide proof of business liability insurance with a minimum of $2,000,000 liability coverage and maintain required liability insurance at all times for services and their responsible employees while on Port owned property. Contractor will be fully responsible to maintain all employee workmen's compensation insurance as mandated by Local, State and Federal requirements. Contractor shall name the Port of Newport as an Additional Insured and provide a Certificate of Insurance confirming Liability and Workers Compensation with a 30-day Notice of Cancellation, prior to starting any work. Contractor shall pay any and all payroll and withholding taxes and any other sums that is required by Local, State or Federal agencies. Prevailing Wages: The Contractor may be required to pay prevailing wage rates depending upon the final total price of the project in conformance to ORS 279C.800 thru 279C.870. A current copy of Prevailing Wage Rates for Public Works contracts in Oregon is available from the State of Oregon, Bureau of Labor and Industries and is also included in Section 40 of these specifications.

Details

53,000 SF.
Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents