Similar Projects
Highway 1 Pedestrian Bridge - City of Watsonville
Infrastructure
Conception
$11,700,000 CJ est. value
Watsonville, CA 95076

Highway 1 Pedestrian Bridge - City of Watsonville
Infrastructure
Conception
$11,700,000 CJ est. value
Watsonville, CA 95076

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

2022 Emergency Routes Resurfacing Project
Infrastructure
Design
$2,514,900 CJ est. value
Santa Cruz, CA 95060

Migrant Headstart at Calabasas Playground Modernization
Infrastructure
Bidding
$200,000 CJ est. value
Watsonville, CA 95076

Migrant Headstart at Calabasas Playground Modernization
Infrastructure
Bidding
$200,000 CJ est. value
Watsonville, CA 95076

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Watsonville DMV Field Office
Term Contract, Infrastructure
Post-Bid
Watsonville, CA 95076

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

SCCSD 2021 Slurry Seal Project
Infrastructure
Results
Less than $60,000 est. value
Capitola, Santa Cruz, CA

Trenchless Concrete Pipe Installations and Install Concrete Headwalls
Infrastructure
Results
$6,800,000 est. value
CA

Affordable Housing - 415 Natural Bridges Drive - City of Santa Cruz
New Construction, Infrastructure - 10,519 SF
Pending Verification
$2,400,000 CJ est. value
Santa Cruz, CA 95060

180 Permanent Supportive Housing Project
Demolition, New Construction, Infrastructure - 49,961 SF
Pending Verification
$14,000,000 CJ est. value
Santa Cruz, CA 95060

Kearney Park - New Playground - City Of Watsonville
Infrastructure
Conception
$400,000 CJ est. value
Watsonville, CA 95076

Septic System Improvements
Infrastructure
Design
$63,250 CJ est. value
Watsonville, CA 95076

Install Draped Mesh and Construct RCP
Infrastructure
Bidding
$2,330,000 CJ est. value
Scotts Valley, CA 95066

Last Updated 08/18/2022 05:34 AM
Project Title

Trout Gulch Road PM 1.85, 1.90, and 3.03 Storm Damage Repair Project

Physical Address View project details and contacts
City, State (County) Aptos, CA 95003   (Santa Cruz County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $618,200 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 17th, 2022, project has not been awarded. No timeline of award was established. Project is anticipated to start construction in about a week or two. The work includes the construction of Rock Slope Protection, soil-wrap slope repair, pavement repairs, guardrail installation, culvert pipe installation, revegetation, and striping. DBE Goal Percentage: 3% Project Duration: 40 Work Days Liquidated Damages: $895.00 Per Calendar Day Bid Bond Percentage: 10% Engineer's Estimated Cost: $596,070 to $596,070 Pre-Qualification for Bidders: Not Required License Type Required: A

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents