Similar Projects
EP-177 Washington Road Sidewalks
Bidding
East Point, GA

Parking Lot Upgrade Services
Bidding
$200,000 est. value
Atlanta, GA

Stormwater Utility On-Call Contractors
Post-Bid
Duluth, GA

Lester Road Pedestrian Improvements
Post-Bid
Union City, GA 30291

Green Infrastructure Design Challenge - Continental Colony Elementary
Results
Atlanta, GA 30331

Sandy Springs Circle Streetscapes
Results
Sandy Springs, GA

1200 Lake Hearn Medical Office Building Parking Lot Improvements
Renovation
Construction
Sandy Springs, GA

CVS #4717 Partial ADA Project
Renovation
Construction
$38,000 est. value
Atlanta, GA 30311

Hapeville CDBG Park Improvements
New Construction
Bidding
Hapeville, GA 30354

Brady Mobility Facility Parking Lot Restriping
Post-Bid
Atlanta, GA

TS137 Johnson Ferry at Glenridge Connector SidePath
Results
Sandy Springs, GA

Stadium Red Lot Bus Only Lane
Bidding
Atlanta, GA 30315

Buckhead CID West Village Streetscape Project
Post-Bid
Atlanta, GA 30301

EP-207 West Taylor Avenue Sidewalks Phase 1
Results
East Point, GA

Providence Park Improvements
New Construction - 635 SF
Bidding
Milton, GA 30009

Last Updated 07/14/2020 11:12 AM
Project Title

Upper Proctor Creek Capacity Relief Project in Historic Vine City, Phase C

Physical Address View project details and contacts
City, State (County) GA   (Fulton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this Contract is outlined in the Technical Requirements and generally includes the following: 1. Construction services for installing storm pipes, curb inlets, replacing concrete curbs and sidewalks, pavement repair and resurfacing, and green infrastructure installation. 2. Coordination with existing utilities and relocating, as necessary. 3. Abandonment of existing utilities including water lines, sewers, storm drains, and appurtenances. 4. Furnishing and installing new utilities and appurtenances, as required. 5. Installing and transferring service connections, where required. 6. Connecting new utilities to existing, where required. 7. Plantings on the Project site. 8. Temporary and permanent erosion and sedimentation control. 9. Traffic control during construction. 10. Right-of-way restoration, including pavement replacement. 11. All associated miscellaneous work, including site restoration and cleanup. 12. Environmental remediation of approximately 5,000 tons.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents