Last Updated | 07/14/2020 11:12 AM |
Project Title | Upper Proctor Creek Capacity Relief Project in Historic Vine City, Phase C |
Physical Address | View project details and contacts |
City, State (County) | GA (Fulton County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sidewalks/Parking Lot, Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work of this Contract is outlined in the Technical Requirements and generally includes the following: 1. Construction services for installing storm pipes, curb inlets, replacing concrete curbs and sidewalks, pavement repair and resurfacing, and green infrastructure installation. 2. Coordination with existing utilities and relocating, as necessary. 3. Abandonment of existing utilities including water lines, sewers, storm drains, and appurtenances. 4. Furnishing and installing new utilities and appurtenances, as required. 5. Installing and transferring service connections, where required. 6. Connecting new utilities to existing, where required. 7. Plantings on the Project site. 8. Temporary and permanent erosion and sedimentation control. 9. Traffic control during construction. 10. Right-of-way restoration, including pavement replacement. 11. All associated miscellaneous work, including site restoration and cleanup. 12. Environmental remediation of approximately 5,000 tons. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |