Similar Projects
Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Well No. 15 Test Hole
Infrastructure
Bidding
$398,050 CJ est. value
Chowchilla, CA 93610

PW Various Locations Pavement Renovation No. 60 and Sewer Replacement
Infrastructure
Bidding
$10,600,000 CJ est. value
San Francisco, CA 94103

Bottle Filling Stations Installation
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Santa Barbara, CA 93101

Plumbing Equipment
Term Contract
Sub-Bidding
Los Angeles, CA 90012

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

Plumbing Services
Term Contract
Results
$200,000 est. value
San Jose, CA 95128

Plumbing Contractor
Term Contract
Results
Concord, CA

Phase 1A Water CIP
Infrastructure
Construction
$1,313,318 CJ est. value
Stockton, CA 95202

Folsom Area Stormwater Improvements - Soma and Mission Districts Sewer Replacement
Infrastructure
Bidding
$8,200,000 CJ est. value
San Francisco, CA 94103

Septic Tank Pumping and Legal Disposal Services in Kern County
Term Contract
Sub-Bidding
Bakersfield, CA 93301

Plumbing Services BPA
Term Contract, Alteration
Post-Bid
Edwards, CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

Fire Station 14 Workforce Privacy Project
Infrastructure, Renovation - 8,820 SF
Bidding
$150,000 CJ est. value
Long Beach, CA 90803

Last Updated 01/20/2023 01:42 PM
Project Title

Lake Murray Improvements 2

Physical Address View project details and contacts
City, State (County) San Diego, CA 92101   (San Diego County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $12,476,051 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Lake Murray Improv 2 consists of the replacement of approximately 3.72 miles of existing 8" AC and 16" AC water mains, approximately 0.16 miles of existing 8" VC sewer mains, water services, sewer laterals, curb ramps, resurfacing, striping, bicycle facilities, and all other work and appurtenances in accordance with the specifications. 1.1. The Work shall be performed in accordance with: 1.1.1. The Notice Inviting Bids and Plans numbered 42197-01-D through 42197-44-D, 42197-T01-D through 42197-T38-D, and 0100488-1-D through 0100488-12-D, inclusive. Online Q&A No Pre-Bid Meeting No Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Bid Valid 120 Calendar Days Liquidated Damages $1,000 Per Day Estimated Bid Value $12,800,000.00 Start/Delivery Date Project Duration 595 Working Days

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents