Similar Projects
Fender System Repairs and Pier E6; E7 and E8 Improvements Structure No. N2.01, Newark Bay Bridge
Post-Bid
NJ

Newark Bay Bridge West Approach; Bridge Deck Reconstruction; Miscellaneous Structural Repairs; Roadway Lighting Improvements; Milepost N0.00 to N6.00
Results

Rehabilitation of New Jersey Turnpike Passaic River Bridges Structure Nos. W107.87 and E107.88
Results

Maintenance Concrete Structural Repair Contract, North - 2019; Various Locations; Bergen, Essex, Hudson, Morris, Passaic, Sussex, Union and Warren (Including and North of Route 57) Counties
Term Contract
Results
$10,000,001 to $20,000,000 est. value

Maintenance Job Order Contracting (JOC) Bridge Repairs, North - 2018
Results
$5,000,001 to $10,000,000 est. value

Maintenance Movable Bridge and Tunnel Repair
Results
$10,000,001 to $20,000,000 est. value

Caven Point Road / National Storage Bridge, Superstructure Replacement
Results
Less than $5,000,000 est. value
Jersey City, NJ

New Jersey Marine Terminals Bridges - Priority Repairs and Concrete Pavement Repairs Via Work Order
Results
$5,000,000 to $10,000,000 est. value
Bayonne, Elizabeth, Jersey City, Newark, NJ

Bridge Fender Repairs and Rehabilitation
Results

Rt. 3 Bridge over Northern Secondary and Ramp a from Tonnelle Avenue (Route 1 and 9) to Route I-495
Results
$20,000,001 to $50,000,000 est. value
NJ

Supervision of Construction Services for Contract No. T100.465 Bridge Repairs and Resurfacing Milepost 92 to 122 and the Newark Bay-Hudson County Extension (2020)
Results
$16,000,000 est. value

PATH - Rehabilitation of Bridge Structures
Results
$1,000,000 to $5,000,000 est. value
Harrison, Newark, NJ

Drawbridge Preventive Maintenance
Results
$10,000,001 to $20,000,000 est. value

Drawbridge Preventive Maintenance Contract
Results
$5,000,001 to $10,000,000 est. value

Drawbridge Preventive Maintenance Contract
Results
$5,000,001 to $10,000,000 est. value

Last Updated 05/17/2019 12:34 PM
Project Title

Jersey Avenue Bridge Over Mill Creek

Physical Address View project details and contacts
City, State (County) Jersey City, NJ 07302   (Hudson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Construction of a new bridge over Mill Creek and Tidewater Basin. The project includes a 117.5 foot bridge and 1340 linear feet of approach roadways, connecting Jersey Avenue and Mill Creek Lane. The bridge will include two 10 foot travel lanes, two 5 foot bike lanes and two 5 foot, 6 inch sidewalks. It will be composed of a single span of prestressed girders on top of pile supported reinforced concrete abutments. Within the project limits there are 550 linear feet of MSE walls and a 216 feet of permanent sheet pile wall.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents