Similar Projects
Little Scholars Academy
Renovation - 2,895 SF
Design
Huntersville, NC 28078

Ardrey Kell Rd
Bidding
$1,088,000 est. value
Charlotte, NC

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Arden, Asheboro, Asheville, Belmont, Chapel Hill, Charlotte, Fayetteville, Greensboro, Kernersville, Lenoir, Reidsville, Rockingham, Troutman, NC

Grey Road Sidewalk and Storm Drainage Improvements
Post-Bid
$500,000 est. value
Davidson, NC 28036

Little Sugar Creek Greenway and Stream Enhancement Project, I-485 to Polk Street
Results
Pineville, NC 28134

Southpark Enhanced Crosswalks - Phase 1
Results
Less than $761,000 est. value
Charlotte, NC

Cross Charlotte Trail - Davidson to Matheson
Post-Bid
$859,000 est. value
Charlotte, NC

McDowell Creek Greenway Project Phase 1A
Results
$1,600,000 to $1,700,000 est. value
Charlotte, NC

Ashley Road Sidewalk
Results
Less than $1,300,000 est. value
Charlotte, NC

Joint Duct Bank Relocation
Results
$200,000 to $400,000 est. value
Charlotte, NC

Minor Transportation Projects FY20 Packet A
Results
Less than $431,000 est. value
Charlotte, NC

Peachtree Hills Sidewalks
Results
$1,137,000 est. value
Charlotte, NC

Oneida Road Sidewalk and Culvert Replacement
Results
$1,712,000 est. value
Charlotte, NC 28206

Sidewalk Gaps and Ramps FY21
Results
$979,660 est. value
Charlotte, NC 28206

Pedestrian Safety FY21
Results
Less than $2,340,800 est. value
Charlotte, NC 28206

Last Updated 05/14/2020 09:26 AM
Project Title

Cross Charlotte Trail - 7th Street to 10th Street Connector

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28206   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,736,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes approximately 3,400 linear feet of the Cross Charlotte Trail between 7th Street and 10th Street. The project begins at the existing Cross Charlotte Trail/Little Sugar Creek Greenway at driveway of the Phillip L Van Every Culinary Arts Center (CPCC) on 7th Street, with a side-path that that runs south on the southern side of the street. The side-path transitions at the intersection to a two-way cycle track on Central Avenue, crossing over US-74. The lanes continue north along Prospect Street and then west along Jackson Avenue to where the trail transitions about to greenway. The greenway parallels I-277 northbound on-ramp northward toward 10th Street where the project work ends. Work includes construction of sidewalks, curb ramps, multi-use path, bike lanes, curb and gutter, pavement markings and signage, grading, erosion control, traffic control, paving, storm drainage and hardscaping.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents