Similar Projects
Furnace and A/C units (2 Locations)
Renovation
Design
Lynnville, IN 47619

HVAC Upgrade - Phase 2
Renovation
Sub-Bidding
$600,000 CJ est. value
Owensville, IN 47665

Highland Hills Middle School - Boiler Replacement
Renovation
Sub-Bidding
$414,000 CJ est. value
Georgetown, IN 47122

Indiana School for the Deaf Building 8 HVAC
Post-Bid
Indianapolis, IN 46205

Neff Hall HVAC Controls Replacement Phase II
Alteration
Post-Bid
Less than $2,000,000 est. value
Fort Wayne, IN 46805

Mechanical Services Indianapolis Public Library
Term Contract
Results
Indianapolis, IN 46208

JE Roush Lake Markle Pump Plant Exhaust Fan
Alteration
Results
Less than $25,000 est. value
Huntington, IN

Kingsford Heights Elementary HVAC and Controls Upgrades
Renovation
Construction
$400,000 CJ est. value
Kingsford Heights, IN 46346

HVAC Upgrade - Phase 2 Haubstadt Community School
Renovation
Sub-Bidding
$1,542,000 CJ est. value
Haubstadt, IN 47639

Ft. Branch Community School HVAC Upgrade - Phase 5
Alteration
Post-Bid
Fort Branch, IN 47648

F103--Boiler and Cooling Tower Water Treatment Program
Term Contract
Results
Danville, IN 46122

Physical Education Complex - Chiller Replacement
Renovation
Sub-Bidding
$500,000 CJ est. value
Vincennes, IN 47591

HVAC Renovations to the Lake Prairie Elementary School
Alteration
Post-Bid
$500,000 est. value
Lowell, IN 46356

Bellmont HS HVAC
Renovation, Alteration
Results
$1,500,000 est. value
Decatur, IN 46733

Thomas Branch Library HVAC
Alteration
Post-Bid
Chesterton, IN 46304

Last Updated 06/01/2023 01:06 PM
Project Title

Wellness Center - Center Grove Community School Corporation - Mechanical, Plumbing, & Fire Protection (BP#04)

Physical Address View project details and contacts
City, State (County) Greenwood, IN 46143   (Johnson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $607,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

By submitting a Bid on the enclosed Bid Form, Bidder satisfies requirement for Indiana Form No. 96 (Revised 2013), as prescribed by State Board of Accounts of Indiana. This shall clearly show Bidder's financial resources, construction experience, organization, and equipment available for Work contemplated. A bid security in the form of AIA Document A310, a certified check, Indiana General Revised Form No. 86, "Contractors Combination Bid Bond and Bond for Construction," or a form from an acceptable surety shall accompany each bid. The bid security shall be in the penal amount of 10 percent of the total bid. Bid security shall be forfeited if bid is withdrawn after closing time on date for receiving bids. Successful bidders are required to furnish separate satisfactory Performance Bond A312 and Payment Bond A312 from an acceptable surety in an amount equal to 100 percent of the full contract sum. The Owner reserves the right to reject each and every bid, and to waive informalities, irregularities, and errors in the bidding to the extent permitted by law. This includes the right to extend the date and time for receipt of bids. No bidder may withdraw their bid within 60 days after the actual date of the bid opening thereof

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents