Similar Projects
Disney Magnet-Gym Floor Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Chicago, IL 60613

Seascape Pool Floor
Alteration
Post-Bid
Hoffman Estates, IL 60169

Flooring Replacement at Andrew, Sandburg and Stagg High Schools
Alteration
Post-Bid
Orland Park, Palos Hills, Tinley Park, IL 60487

Des Plaines Boardroom Expansion/Renovation Athletic/Theater Wing Flooring Replacement
Term Contract
Results
Arlington Heights, IL

N072--Removal and Replacement of Existing Flooring
Term Contract
Results
Chicago, IL 60612

Carpet Replacement
Alteration
Post-Bid
Elk Grove Village, IL

Gym Floor and Bleacher Replacement
Renovation, Alteration
Results
Streamwood, IL 60107

2022 Floor Tile Abatement
Alteration
Post-Bid
La Grange, IL

Construction Services for carpet, floor, wood concrete and sub-floor
Alteration
Results
Chicago, IL 60661

2022 Cutting Hall and Falcon Recreation Center Carpet Replacement
Alteration
Post-Bid
Arlington Heights, IL

Furnish and Installation of Flooring
Alteration
Results
IL

Master Facility Plan
Demolition, Alteration
Post-Bid
Park Ridge, IL

Highcrest Middle School Flooring
Alteration
Results
$200,000 est. value
Wilmette, IL 60091

2022 Gym Floor Replacement
Alteration
Post-Bid
Oak Forest, Orland Park, IL 60452

Gymnasium Floor
Alteration
Results
$100,000 est. value
Chicago, IL 60632

Last Updated 06/01/2023 01:31 AM
Project Title

Community Center Room 1E Floor Installation

Physical Address View project details and contacts
City, State (County) Palatine, IL 60074   (Cook County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Palatine Park District reserves the right to accept or reject any or all bids, and also reserves the right to accept only portions of a proposal and reject the remainder. Description of Work Area of work includes Community Center Room IE approximately 2,160 square feet. The contractor is responsible for field verification of all measurements on site and determination of quantities necessary to complete the work as specified. All workmanship will be of the highest professional standards and meet the product manufacturers specifications. New floor project must be completed between one of the following date windows: August 28-September 3, 2023 or November 20-26, 2023 or December 18-24, 2023 or an date window agreed upon between winning vender and Park District. Technical Specifications Community Room IE Floor Replacement o Remove and dispose of offsite exiting plastic tile floor, base, and exiting VCT flooring. o Scarify and prepare floor to accept the new flooring product per manufactures specifications. This may require the entire floor to be diamond grind to ensure an even surface before laying down the new floor. Any diamond grinding must be done using a dust collection system. o Furnish all materials and labor to prepare the existing floor surface, including patching and leveling and provide and install new specified flooring product and wall base or approved equivalent based on manufactures Installation instructions. o Products installed per manufacturers specifications. The finished floor and base surface must be even and uniform absent of pitting, high spots, cracks, etc. o Warranty workmanship for 5 years

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents