Similar Projects
BPA for Maintenance of York Chiller
Term Contract
Bidding
Corpus Christi, TX

HVAC and Boiler Repairs for the Corpus Christi State Supported Living Center
Term Contract, Alteration
Bidding
Corpus Christi, TX 78405

Bldg 3 Hvac Replacement
Post-Bid
Corpus Christi, TX 78419

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Heating/Ventilation/Air Conditioning Supplies/Equipment
Term Contract
Results
Corpus Christi, TX 78401

Air and Water Cooled Chiller Annual Inspections and Preventative Maintenance
Term Contract
Results
Corpus Christi, TX 78411

Exhaust Hood & Duct Cleaning - 2 Month Service
Post-Bid
San Antonio, TX 78275

Booth #2 Exaust Ventilation Ducting System
Results
Corpus Christi, TX 78419

Mary & Jack Bell Library Hot Water Tie In & AHU Replacements
Alteration
Post-Bid
Corpus Christi, TX

Time and Material - Heating, Ventilation and Air Conditioning Services
Term Contract
Results
Corpus Christi, TX

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Vent Hood Cleaning Services
Term Contract
Results
Corpus Christi, TX 78403

HVAC Upgrades at Adkins Middle School, Barnes Elementary School, and Crockett Elementary School
Alteration
Post-Bid
Corpus Christi, TX 78414

Water Treatment Services for Chill Water and Hot Water Heating Systems
Results
Less than $73,200 est. value
Corpus Christi, TX 78403

Administration and Middle School HVAC System Upgrades
Alteration
Post-Bid
Port Aransas, TX

Last Updated 10/21/2021 12:10 PM
Project Title

USCG Sector Corpus Christi HVAC Replacement

Physical Address View project details and contacts
City, State (County) Corpus Christi, TX   (Nueces County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this task order, under Sector Corpus Christi Engineering Support Division, is to replace one 3-ton and one 4-ton in and out HVAC systems that service the ESD building. isconnect, remove, and properly dispose the old units. Inspect and repair existing stand. Provide and install a 3-ton American Standard or equivalent air handler and one 3-ton American Standard or equivalent condenser. Provide and install a 4-ton American Standard or equivalent air handler and one 4-ton American Standard or equivalent condenser. Tie down the units to the existing stand. Perform necessary vacuum of refrigerant, and balance system to manufacturer recommendation. Clean up and properly dispose of all debris created as a result of contractor work performed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents