Similar Projects
Replacement of 3 Compressors STA Duluth
Bidding
Duluth, MN 55802

Multiple HVAC Equipment Replacement Units
Bidding
Saint Paul, MN 55119

HVAC Filters
Term Contract
Post-Bid
Anoka, MN 55303

MBC - Alerton Controls Services
Term Contract
Post-Bid
Minneapolis, MN

HVAC System Replacement
Results
Grand Rapids, MN 55744

HVAC Upgrades
Results
Minneapolis, MN 55411

Water Treatment Plant Rooftop Unit Replacements
Bidding
Bloomington, MN

Filter Replacement Services at PHA Properties
Post-Bid
Saint Paul, MN

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

Itasca State Park Shop Boilers Replacement
Bidding
$95,000 est. value
Park Rapids, MN 56470

F108--Chemo Hood Vent Decontamination and Disposal St. Cloud
Post-Bid
Saint Cloud, MN

Johnson High School HVAC Replacement
Results
Saint Paul, MN 55106

Multiple Site Furnace Unit Replacement
Bidding
Mapleton, MN 56065

Natatorium HVAC
Post-Bid
Rochester, MN

Franklin Elementary School HVAC Improvements 2020
Results
Mankato, MN 56001

Reported 04/14/2021 12:00 AM
Project Title

2021 Terminal 2 Preconditioned Air Units Replacement

Physical Address View project details and contacts
City, State (County) MN 55111   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides for the replacement of six (6) Preconditioned Air Units (PCA) along with the removal of two (2) Ground Power Units and replacement with four (4) new Ground Power Units. The work will require removal and replacement of associated electrical feeds to the equipment to comply with current electrical codes and MAC standards. The installation of steel guide posts around newly installed electrical control panels are also included in this project. The goal of the MAC for the utilization of Targeted Group Businesses on this project is 3%.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents