Similar Projects
Drainage Improvements and Erosion Repair at Brazos Bend State Park
Bidding
$900,000 to $1,300,000 est. value
Needville, TX 77461

Emergency Repair to the Brazos River Outfall
Bidding
TX

Construction of Grand Mission Regional Detention System Maintenance
Post-Bid
$600,000 est. value
TX

Dry Creek Regional Detention Pond Phase 2
Post-Bid
$844,430 est. value
Rosenberg, TX

Construction of Long Meadow Farms Section 46, Phase 1A Water, Sewer, and Drainage Improvements
Results
TX

Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Twinwood Estate Entrance
Results
TX

Construction of Driveways for Alice Street and South Post Oak Boulevard
Bidding
Richmond, TX

Water, Sanitary, and Drainage Facilities in Grand Mission Estates Section 26, Section 27, Lift Station No. 2, and Force Main
Post-Bid
$1,700,000 est. value
TX

Construction of the Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Southern Colony Section 5
Results
Less than $278,500 est. value
TX

Twinwood Parkway Phase 1B, Segment A and Segment A Bridges
New Construction
Bidding
TX

Section 17-18 for Jordan Ranch
Post-Bid
Fulshear, TX 77441

Deer Run Meadows Detention Pond
Results
Less than $1,719,602 est. value
TX

Detention Basin (Phase 1) for the Harris County Flood Control District
Bidding
Houston, TX

Construction of Water, Sanitary Sewer, and Drainage Facilities for Sunset Crossing Section 3
Post-Bid
$1,000,000 to $1,200,000 est. value
TX

Water, Sanitary and Drainage Facilities in Creekside Ranch Section 11
Results
TX

Last Updated 10/07/2020 05:42 AM
Project Title

Flood Control Improvements - Dam III Oyster Creek at Lexington

Physical Address View project details and contacts
City, State (County) Sugar Land, TX 77479   (Fort Bend County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work for the Flood Control Improvements – Dam III Oyster Creek at Lexington generally includes the following major tasks: Perform site clearing (trees, brush, weeds, trash, debris, and existing rubble riprap), construct a reinforced concrete trapezoidal channel spillway to the east of the existing reinforced concrete gated service spillway, add a gravel road, and install engineered riprap slope protection immediately upstream and downstream of Dam III Oyster Creek at Lexington.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents