Similar Projects
Pike Road Housing Development
New Construction, Infrastructure
Conception
$400,000,000 CJ est. value
Pike Road, AL 36064

Pike Road Housing Development
New Construction, Infrastructure
Conception
$400,000,000 CJ est. value
Pike Road, AL 36064

Residence Inn By Marriott / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

Home 2 Suites / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

F-35: Engine Shop
Infrastructure, Renovation
Bidding
$5,000,000 CJ est. value
Montgomery, AL 36108

F-35: Engine Shop
Infrastructure, Renovation
Bidding
$5,000,000 CJ est. value
Montgomery, AL 36108

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Constructing the Roadway Improvements (High Friction Surface Treatment) on the i-85 Southbound Ramp to i-65 (Southbound) in Montgomery
Infrastructure
Results
$420,888 to $514,419 est. value
Montgomery, AL

Industrial Park Boulevard Extension
Infrastructure
Results
$300,000 to $500,000 est. value
Montgomery, AL

New Recreation Center - City of Montgomery
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Montgomery, AL 36104

Motley Drive Townhouse
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Montgomery, AL 36110

Beverage Park - Manna Capital Partners Manufacturing Facility
New Construction, Infrastructure - 1,700,000 SF
Conception
$600,000,000 CJ est. value
Montgomery, AL 36104

Chiller Preventative Maintenance
Term Contract
Design
Montgomery, AL 36109

Gravel Parking for the Lagoon Park Disc Golf Course
Infrastructure
Bidding
$100,000 CJ est. value
Montgomery, AL 36109

Last Updated 08/14/2023 01:31 PM
Project Title

Weapons Load Crew Training Facility

Physical Address View project details and contacts
City, State (County) Montgomery, AL 36104   (Montgomery County)
Category(s) Commercial, Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Warehouse/Storage, Water Lines
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $10,288,908 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The USPFO for Alabama intends to issue and Invitation for Bids to award a single firm fixed-price contract for construction services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a 10,000 square foot building housing the Base's Weapons Load Crew Training Facility. The new buildings structural system includes slab on grade with engineered fill soil stabilization, structural steel framing as well as load bearing masonry, open web joists, a pre-engineered metal building system and metal roof decking. The roof will have sloped standing seam roofing on rigid insulation. The exterior walls include veneer brick and stone, aluminum storefronts, translucent wall assemblies, and metal wall panels. Major building systems include a high efficiency air-cooled heat pump system and a geothermal heat pump for HVAC systems. Underground utility work for the facility will include all necessary power, sanitary, gas, water, and telecommunications infrastructure. Coordination will be required with existing utilities to maintain operation through and around the site and will include power, sanitary, gas, water, and data. Site work will comprise of on-site access driveways and parking consisting of a combination of asphalt paving and concrete paving. Question Deadline 07/14/2023 at 12:00 PM CT All questions for the pre-bid conference must be submitted via email to; william.hall.13@us.af.mil, and karey.l.elias.civ@army.mil. MAGNITUDE OF PROJECT: Between $5,000,000 and $10,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

10,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents