Similar Projects
North Perry Village North Perry Harbor Dredging 2021
Bidding
North Perry, OH 44081

Dredging Support for the Great Lakes and Ohio Rivers Division (LRD)
Bidding

Roseville OH LPP Moxahala Creek Dredging and Disposal
Post-Bid
$25,000 to $100,000 est. value
Mount Sterling, OH 43143

FY21 Ashtabula 204 (Submerged) Breakwater Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Ashtabula, OH

Dredging of the Moxahala Creek, Roseville, OH
Results
Roseville, OH 43777

Cleveland Harbor Maintenance Dredging
Results
$5,000,000 to $10,000,000 est. value
Cleveland, OH

Moxahala Creek Dredging & Disposal
Results
Roseville, OH 43777

Miller Road Park Sand Dredging 2020
Results
Avon Lake, OH 44011

Zepernick Lake Boat Ramp Improvements
Results
$303,278 est. value
Columbus, OH

Cleveland Bulk Terminal Maintenance Dredging Project
Results
Cleveland, OH 44113

Design-Build and Operations Services for the Grand River Dredging Reuse Facility Project
Results
Painesville, OH 44077

Sand Beach Conservancy District Dredging Project
Results
Less than $62,340 est. value
OH

Last Updated 04/07/2020 09:37 AM
Project Title

Regional Hydraulic Dredging

Physical Address View project details and contacts
City, State (County) Cumberland, OH   (Guernsey County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Regional Hydraulic Dredging: Project work consists of furnishing, deliver, and operating one cutterhead hydraulic pipeline dredge and associated attendant plant. the dredge will be required to move an estimated ***162,000,000*** cubic feet of material during the contract period. The dredge shall perform channel maintenance dredging Ohio River [River Mile (RM) 150.0-981.0] and Ohio River pool areas of tributaries, Cumberland River (RM 0.0-105) and Upper Mississippi River (RM0.0-185.0). The dredge will be used primarily to make or enlarge dredge cuts in various constricted channels, lock approaches, and harbors twenty-four hours per day seven days per week.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents