Similar Projects
Building L Epoxy Floor
Bidding
Orem, UT 84097

Construction Job Notice: Floor Coverings, South Kearns and Roosevelt Schools
Post-Bid
Kearns, UT 84118

Statewide Flooring and Installation
Post-Bid
Salt Lake City, UT 84114

Roof Replacement and Flooring Replacement
Results
Provo, UT

Athletic Flooring, Weight and Fitness Equipment and Golf/Multi-Sport Simulator for Ben Lomond High School Athletic Center
Results
Ogden, UT 84404

Replacement and Installation of Carpet and VCT at Various Locations
Post-Bid
Price, UT

Floor Finish (2020)
Results
Alpine, UT 84042

State of Utah Floorcovering and Installation
Term Contract
Post-Bid
Salt Lake City, UT 84114

SSD Gym Floor Refinish
Results
$20,000 to $30,000 est. value
Richfield, UT 84701

Crossville Studios Tile or Equal
Post-Bid
Clearfield, UT 84016

Mill Creek Sediment Basin Concrete Floor Project
Results
Farmington, UT 84025

Tiling of Bathrooms for State Hospital
Post-Bid
Salt Lake City, UT 84114

Prep and Installation of VCT Flooring Inside the Ogden Union Station`s Car Museum
Results
Ogden, UT 84401

The INN Between Carpet Installation
Post-Bid
Salt Lake City, UT 84105

Pratt Aquatic Center - Pool Deck Drain Repair
Results
$175,900 est. value
Tooele, UT 84074

Last Updated 05/07/2021 10:50 AM
Project Title

DFCM Construction-Department of Alcoholic Beverage Control - Herriman Liquor Store Floor Repair

Physical Address View project details and contacts
City, State (County) Herriman, UT 84096   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing Herriman Liquor Store has approximately 7,300 sf of sales floor with a stained concrete floor finish. The scope of the project is to install Dekton tile flooring over the existing flooring on the sales floor, add ADA transition strips where the new floor meets the adjacent concrete floor, temporarily remove modular partitions, and reinstall the partitions after the new flooring is installed. The project includes phasing the installation in two parts, allowing customers to shop and checkout during project execution.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents