Similar Projects
First Avenue - River To Grant - SR11 - City Of Tucson
Infrastructure
Conception
$71,988,200 CJ est. value
Tucson, AZ 85719

Houghton Road - 22nd Street To Irvington - SR1J - City Of Tucson
Infrastructure
Conception
$39,379,900 CJ est. value
Tucson, AZ 85747

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

Houghton Road Self Storage
New Construction, Infrastructure - 87,523 SF
Design
$20,000,000 CJ est. value
Tucson, AZ 85747

Tucson - Benson Highway (I-10) (Ajo Way to MP 272)
Infrastructure
Bidding
$27,461,166 CJ est. value
Tucson, AZ 85706

Casa Grande - Tucson Highway (I-10) (Ina Road to Ruthrauff Road)
Infrastructure
Bidding
$200,000,000 CJ est. value
Tucson, AZ 85706

Tangerine Road Corridor Project Interstate 10 to Dove Mountain Boulevard/Twin Peaks Road - Phase 2 - Town of Marana
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Marana, AZ 85658

Ameri-Park / Marana - Revised
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Marana, AZ 85653

World-Wide Water Storage Tank Remediation
Term Contract
Results

Pefo Replace Water Tank Ladder
Results

TOKA 12 Lot Subdivision - San Xavier District
New Construction
Construction
$1,271,309 est. value
Tucson, AZ 85746

Lohse Family YMCA Phase 2 - TI Package
Infrastructure, Renovation
Construction
$2,500,000 CJ est. value
Tucson, AZ 85701

22nd Street Manufacturing and Warehouse Building
New Construction, Infrastructure - 16,100 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85713

River Road Townhome Development
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Tucson, AZ 85704

Iron Horse Park - D199 - City of Tucson
Infrastructure
Conception
$193,000 CJ est. value
Tucson, AZ 85705

Last Updated 09/14/2022 12:32 AM
Project Title

La Paloma Reclaimed Reservoir Rehabilitation - W310 - City of Tucson

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85701   (Pima County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,289,700 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Inspection of the existing reservoir show indications of deterioration, structural deficiencies and water tightness concerns which need to be addressed. The primary concern is cracking and spalling of the pre-stressed concrete roof panels and bearing area for these panels. As of September 13, 2022, this project is included in the City of Tucson FY 2023 - 2027 Budget CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents