Similar Projects
Water Filtration Plant Phase 2
New Construction
Bidding
Everett, WA

Well No. 6
Alteration
Bidding
$2,189,000 est. value
College Place, WA 99324

Water Station 5 Reservoirs and Pump Station
Infrastructure
Results
$28,250,000 est. value
Vancouver, WA 98687

Thomas Lake Lift Station Replacement
Renovation
Bidding
$2,187,000 est. value
Mill Creek, WA 98012

Richmond Beach Pump Station Low Voltage Switchboard and MCC Replacement
Alteration
Post-Bid
$2,558,000 est. value
Seattle, WA 98177

Tapteal 1 Pump Station Upgrade
Infrastructure
Post-Bid
Richland, WA 99352

North Mercer Island and Enatai Interceptor Upgrade - Pump Station Improvements
Alteration
Bidding
Mercer Island, WA 98040

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Bidding
$2,300,000 est. value
Medina, WA 98039

Last Updated 10/12/2021 11:16 AM
Project Title

Gooseberry Point Wastewater Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Bellingham, WA 98226   (Whatcom County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Pumps and Wells, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,000,000 to $14,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will construct improvements to the existing wastewater treatment plant to increase the plant capacity to a maximum month flow of 557,000 gallons per day. The project includes construction of a new headworks facility, two new primary clarifiers, one new secondary clarifier, two new aerobic digesters and associated sludge handling and thickening equipment, one new plant drain pump station, one new effluent pump station, a new primary clarifier pump building, and a new operations building. The project also includes modifications to the existing rotating biological contactors, modifications to the existing process tanks to convert them to contact and stabilization basins, modifications to the existing equipment building including replacement of the existing equipment, modifications to the existing two secondary clarifiers with new clarifier mechanisms, modifications to the existing ultraviolet disinfection system, modifications of existing abandoned chlorine contact tank to a non-potable water wet well and an effluent wet well.

Details

Lift and Pump Stations, New Construction, Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.