Similar Projects
NMSU Agricultural Modernization - Bid Lot 4
New Construction
Bidding
Las Cruces, NM

Art Classroom Renovations
Renovation
Post-Bid
$4,700,000 est. value
Albuquerque, NM 87106

Harlan Hall Phase III
Post-Bid
Silver City, NM 88062

Construction Manager at Risk Gallup Campus New Physical Plant and Storage Facility
New Construction - 7,200 SF
Results
$2,000,000 est. value
Gallup, NM

Nexus Phase 1 Renovation
Renovation
Results
Portales, NM

Physical Plant Steel Storage Buildings
Construction
Portales, NM 88130

Construction Manager at Risk- HSC Center of Excellence for Orthopedic Surgery and Rehabilitation
Post-Bid
Less than $21,000,000 est. value
Albuquerque, NM 87131

UNM Construction Manager at Risk (CMAR)- UNM Taos College Pathways to Careers Center
Results
Less than $5,575,000 est. value
Albuquerque, NM

UNM Job Order Contracting
Post-Bid
Albuquerque, NM 87131

UNM Student Health Counseling Center Renovation
Renovation
Results
Albuquerque, NM 87131

UNMH Main Operating Room - Pre-Op and Locker Room Renovations
Renovation
Post-Bid
Less than $1,200,000 est. value
Albuquerque, NM

UNM On-Call Contractors
Results
Albuquerque, NM 87131

UNM Valencia Infrastructure
Post-Bid
Less than $3,813,206 est. value
Albuquerque, NM 87131

3626 Alamogordo - Student Services (292H) First Floor Renovations
Results
Alamogordo, NM

UNMH ACC - Facilities - Ambulatory Elevator Refurbishment (4,5,6)
Renovation
Post-Bid
Albuquerque, NM 87106

Last Updated 07/14/2020 03:26 PM
Project Title

Architect Services Harlan Hall

Physical Address View project details and contacts
City, State (County) Silver City, NM 88061   (Grant County)
Category(s) Education, Green Building
Sub-Category(s) College/University, LEED Certified
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Architectural Services: 1. Programming Phase: project administration, owners-supplied data coordination, establishment of program goals and needs, CMAR pre-design, LEED Silver analysis 2. Schematic Design Phase: project administration, concept design for all applicable disciplines including but not limited to: architectural, mechanical, electrical, LEED silver, plumbing, statement of probable construction cost in conjunction with CMAR value engineering, presentation of design to owner. 3. Design Development Phase: project administration, finalization of design and selection of materials and systems for all applicable disciplines including but not limited to: architectural, mechanical, electrical, LEED silver, plumbing, 17 statement of probable construction cost in conjunction with CMAR value engineering, presentation of design to owner. 4. Construction Document Phase: project administration, finalization of design and selection of materials and systems for all applicable disciplines including but not limited to: architectural, mechanical, electrical, LEED silver, plumbing, detailed construction cost in conjunction with CMAR value engineering, presentation of design to owner, obtaining licensing agencies’ and other regulatory entities’ reviews and approvals 5. Bidding Phase: project administration, periodic construction field observations, administration of progress meetings, review and disposition of submittals, change orders, requests for information, contractor pay requests, interpretation of documents, monitoring construction schedule, coordination of applicable regulatory agency review and approvals, determination of substantial and final completion, project close-out (maintenance, operation, and start-up assistance, recording of construction and warranty documents) 6. Post-construction Services: maintenance and operational troubleshooting, eleven-month warranty review.

Details

1 College/University, 2 Stories Above Grade, 32,330 SF Renovation.
Division 03 - Concrete, Architectural Concrete, Heavyweight Architectural Concrete.
Division 04 - Masonry, Concrete Unit Masonry, Architectural Concrete Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Architectural Woodwork, Exterior Architectural Woodwork, Interior Architectural Woodwork.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents