Similar Projects
World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Tanker
Post-Bid
Mullins, SC 29574

Phase 2 - Kraft-Heinz Ground Storage Tank and Pump Station
Results
Newberry, SC

2013 R.D. - Kirksey Mtn. Tank Project - Division 1 and 2
Post-Bid
Six Mile, SC 29682

Milam Road Elevated Tank
Results
SC

AFFF Tank Removal
Post-Bid
Beaufort, SC 29904

Water System Improvements Repair and Painting Highway 9 Elevated Tank
Results
Dillon, SC 29536

Elevated Storage Tank Coating
Post-Bid
Georgetown, SC 29440

Water Storage Tank Maintenance Program
Results
Less than $89,105 est. value
Ruffin, Walterboro, SC 29488

North 5th Street Tank Rehabilitation
Post-Bid
Less than $180,000 est. value
Hartsville, SC 29551

Port Tank Rehabilitation
Results
Georgetown, SC 29442

Tank Farm Relocation
Post-Bid
Less than $200,000 est. value
Cheraw, SC

Last Updated 08/04/2021 11:33 AM
Project Title

ETC Elevated Water Storage Tank

Physical Address View project details and contacts
City, State (County) Saint George, SC 29477   (Dorchester County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work on the Project includes the construction of a 500,000-gallon elevated spheroid steel water storage tank along with associated site, piping and valving, electrical and controls work. This work includes but is not limited to: site clearing and preparation; implementation of erosion control measures; grading; excavation and construction of tank foundation; spheroid steel water tank construction and testing; and installation of associated utility lines, valves, and hydrants. Also included is electrical appurtenances, SCADA controls and integration, erection of perimeter fencing, and construction of finished access road. The Work includes all items as indicated elsewhere in the Specifications and Drawings. The new elevated spheroid steel water storage tank shall be in complete accordance with the latest version of AWWA D100

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents