Similar Projects
MDC North Campus Buildings 3000, 5000 & 8000 Mechanical Upgrades
Alteration
Post-Bid
$3,500,000 est. value
Miami, FL 33167

19th Hole Walk-in Cooler
Alteration
Post-Bid
Sebastian, FL 32976

Filter Backwash Drain Improvements at the John A Buckley Water Treatment Plant
Results
$1,569,940 est. value
Melbourne, FL 32934

J065--FY21: Chiller Maintenance Services
Results
Tampa, FL

Two Sites Chiller Replacement
Alteration
Post-Bid
Maitland, Orlando, FL 32751

Hot Reheat Pipe Replacement Project at Cane Island Power Plant
Results
Intercession City, FL 33848

Escambia County Boiler PM
Term Contract
Post-Bid
Pensacola, FL 32502

Y1DA--FY21 NRM Tier 2 (PROJ: 573-20-106) DB - Replace Flanged Valves Hospital Wide
Results
$1,000,000 to $5,000,000 est. value
Gainesville, FL 32608

Maintenance and Repair of Two Cleaver Brooks Boiler
Alteration
Post-Bid
Miramar, FL 33027

Weatherization Assistance Program - HVAC and Mechanical
Alteration
Results
$31,415 est. value
Miami, FL 33150

Replace and Enlarge Existing Walk-In Cooler
Alteration
Post-Bid
Barefoot Bay, FL

H345--Service: Backflow Prevention Evaluation for LCHCC
Term Contract
Results
Cape Coral, FL 33909

Water and Wastewater Treatment
Term Contract
Post-Bid
FL

Heat Recovery Steam Generator (HRSG) Cleaning Services
Term Contract
Results
Lakeland, FL 33805

Boiler and Water Heater Inspections and Repairs
Term Contract
Post-Bid
$75,000 est. value
FL

Last Updated 01/18/2023 06:02 PM
Project Title

Wastewater Treatment Plant (WWTP) Improvements - Mechanical

Physical Address View project details and contacts
City, State (County) Punta Gorda, FL 33982   (Charlotte County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status All Submissions Received, Results Expected, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Wharton-Smith is the Construction Manager at Risk who is soliciting proposals and assuring that MBE and WBE firms are used, when possible, for the City of Punta Gorda Wastewater Treatment Plant Improvements 2022. Please advise Wharton-Smith should your office require special accommodations with bonding or insurance. Bid packages available to bid on include sitework, concrete, mechanical, roofing, doors & hardware, overhead doors, paint & coatings, metal building systems, HVAC, electrical, geotechnical improvements, instrumentation & controls, prestressed concrete tanks, stainless steel slide gates, rotary screw blowers, axially split case pumps, end suction process pumps, double disc pumps, submersible solids handling pumps, submersible axial flow pumps, step screens, variable-speed submersible mixers, secondary clarifier equipment, coarse bubble diffusers, flexible membrane disc diffuser, and emergency generator/fuel tank. Question Deadline 12/20/2022 at 1:00 PM ET Questions or clarifications can be emailed to EstimatingFtMyers@whartonsmith.com

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents