Similar Projects
South Providence - Steam Boiler Repair
Alteration
Bidding
$200,000 est. value
Waxhaw, NC 28173

Water Heater and HVAC Replacement
Alteration
Bidding
$200,000 est. value
Goldsboro, NC 27530

ECSU - Mechanical System Upgrades
Post-Bid
Less than $700,000 est. value
Elizabeth City, NC 27909

South Campus Building 1000 Boiler Replacement
Post-Bid
Concord, NC 28027

Union West Library Boiler Replacement
Results
Indian Trail, NC 28079

Steam Repairs Phase VIIIC
Results
$1,200,000 to $1,500,000 est. value
Raleigh, NC 27695

Clearwater Ceramics Center
Alteration
Construction
Concord, NC

Garner Elementary School Chiller and Boilers Replacement
Alteration
Bidding
$358,000 est. value
Garner, NC 27529

Sumner Elementary Chiller Replacement Project
Post-Bid
Greensboro, NC 27406

Boiler Retubing
Results
Butner, NC 27509

Replacement Of A Boiler At East Iredell Middle School
Post-Bid
Statesville, NC 28625

B-4639 Clean Diffussers, Digester #3, WWTP
Results
$25,000 to $100,000 est. value
Havelock, NC 28533

Removal and Replacement of Two (2) Hot Water Heaters
Post-Bid
Wilmington, NC

Building SJ - ILC Renovations
Results
Raleigh, NC

Steam and Boiler Water Treatment Services
Post-Bid
Kinston, NC 28504

Reported 06/02/2022 12:00 AM
Project Title

Terry Sanford High School Gym Hydronic Pipe Replacement

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28303   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected November 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Mechanical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Terry Sanford High School Gym Hydronic Pipe Replacement. The Contractor shall replace all the steel hydronic pipe inside the gym area with SDR 9 polypropylene piping similar to Aquatherm Blue Pipe SDR 9 MF RP or approved equal. Single prime proposals only will be received for all construction work. The Owner encourages participation by minority businesses.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Hydronic Piping and Pumps, Hydronic Piping.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents