Similar Projects
Last Updated | 06/23/2021 08:49 AM |
Project Title | Stormwater Management Basin Improvements Various Locations |
Physical Address | View project details and contacts |
City, State (County) | New Castle, DE (New Castle County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Rehabilitation of stormwater management basins as summarized below. Improvements to seven (7) existing stormwater management basins located on private open space in the following subdivisions: Chandeleur Woods (three basins), Mariners Watch, Norwegian Woods, Salem Woods, and Shipley Farms. Work will include erosion and sediment control measures, temporary bypass pumping, removal and disposal of existing outlet structures and/or discharge pipes, placement of new outlet structures, discharge pipes, and/or flared end sections, backfilling, regrading and stabilization of embankments and channels, removal of erosion control meas ures, and preparation of as-built plans in accordance with the contract specifications and drawings. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |