Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

DMC Green Roof Structural Reinforcement
Demolition, Alteration
Post-Bid
Milwaukee, WI 53203

Micro-Grid System
Term Contract
Post-Bid
Milwaukee, WI

Energy Conservation Corridor Ceiling and Lighting Upgrade - Madison High School
Results
Milwaukee, WI 53218

Replace Two (2) Power Distribution Units
Term Contract
Results
Milwaukee, WI 53295

Upgrade Electrical System Area 2
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Milwaukee, WI

Riverside University High School - Stage and Auditorium Lighting
Alteration
Results
Milwaukee, WI 53211

Street Light Cables
Term Contract
Post-Bid
Milwaukee, WI

Replacement of a Diesel Generator and Brand Name or Equal AXI FPS-SX-F Fuel Polishing System for Weather Service Office Milwaukee, Wisconsin
Term Contract
Results
Dousman, Milwaukee, WI 53118

Corridor Ceiling & Lighting Upgrade
Infrastructure
Post-Bid
Milwaukee, WI 53213

Effluent Pump MCC and VFD Upgrades at South Shore Water Reclamation Facility
Alteration
Results
Milwaukee, Oak Creek, WI 53154

High Voltage Testing GMIA 5 year service contract
Alteration
Post-Bid
Milwaukee, WI 53207

Electrical for Remodeling at Rent Assistance Office
Alteration
Results
Milwaukee, WI

Furnish and Deliver 400 HP Explosion Proof Electrical Motor
Alteration
Post-Bid
Milwaukee, WI

Time and Material Behavioral Health Division - Electrical
Alteration
Results
Wauwatosa, WI 53226

Last Updated 01/20/2023 11:38 AM
Project Title

Valve Wiring Replacements

Physical Address View project details and contacts
City, State (County) Wauwatosa, WI 53226   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $55,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project contemplated herein consists of the Contractor replacing the 12 power wires and associated control wiring to all four valves from the control building CT01 to the bottom of the Northwest Service Relief Tunnel. All contractor and subcontractor employees shall obtain specific site plant safety training from Veolia Water prior to working on the site. Veolia Water will offer a total of two one-hour training sessions to the contractor and any subcontractors. The Contractor shall adhere to all Veolia Water safety policy and procedures. Bid packages for furnishing all plant labor, equipment, materials and performing all work necessary for this project. Bid results may be publicly viewed, Wednesday, January 18, 2023 no later than 2:30 p.m., electronically or the Veolia Procurement Office, 1st Floor, Maintenance Building #280, located at the Jones Island Water Reclamation Facility, 700 East Jones Street, Milwaukee, WI 53207. Questions pertaining to the proposed work should be directed to David Perry, (414) 378-9911. The time for completion of the Contract shall be one hundred twenty (120) days from the date of Notice to Proceed. Veolia Water reserves its rights to reject any Bid, to reject all Bids, and any bid not conforming to the intent of the invitation for bids and to postpone the award of the Contract for a period of time not exceeding one hundred twenty (120) days from the bid opening date. Bids shall remain firm and may not be withdrawn during this one hundred twenty (120) day period. Veolia Water reserves its rights to waive any informality or deficiency in any Bid, to accept any Bid, to negotiate modifications of any Bid with any Bidder and accept any modified Bid, and to rebid the Project, all at Veolia Water's sole discretion. All interested bidders should direct their questions about the pre-bid meeting to barbara.brown2@veolia.com or call 414-747-3852 or information concerning the proposed request for bid or any other questions, please contact me at (414) 747-3852 or David Perry at (414) 378-9911. Veolia Water/MMSD participation goals for SWMBE are: Minority-owned Business - 13% Small Business/Veteran-owned Business - 5% Women-owned Business - 2% The overall SWMBE goal is twenty (20) percent The power and associated control wires to four valves at the CT01 control station are in need of replacement. The power and control wires that shall be replaced run from the control building down to the Northwest Side Remote Storage (NWSRS). The existing wiring extends to the valve pit through multiple 2" conduit. Only two of the four sets of power wires are not operating properly and are not opening valve #2 (FV-120) and valve #3 (FV-130). Since it is impractical the remove only these two bundles of damaged wiring from the conduit, all four groups of wiring shall be replaced. The control wires for the valves are just as old as the power wires, and therefore will be replaced during this process as well.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents