Similar Projects
2021 Sanitary Sewer Rehabilitation Program
Post-Bid
Northglenn, CO

SC, SC5B and S. Ouray Way Sanitary Sewer Upgrade Project
Infrastructure
Post-Bid
$4,521,000 to $5,235,000 est. value
Aurora, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

Public Improvements within Phase 2 of The Point Redevelopment Project
Construction

Box Elder Infrastructure Project Phase I
Infrastructure
Post-Bid
Aurora, CO

On-Call Pipeline Construction Services
Term Contract
Results
Brighton, CO

East 58th Avenue Improvements
Infrastructure
Post-Bid
CO

H199--Grease Trap and Sand Trap Maintenance - 554
Results
Aurora, CO 80045

Acoustic Sewer Line Inspection
Infrastructure
Post-Bid
Brighton, CO

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Modules C, D, E, Sanitary Sewer Line Replacement for the Detention Facility
Results
Brighton, CO

2021 SACWSD Wastewater System Rehabilitation
Results
Less than $1,625,840 est. value
Commerce City, CO

Various Water Sewer and Road Materials State Forest State Park
Results
Denver, CO

2021 SACWSD Water System Removal and Replacements
Results
Less than $3,284,875 est. value
CO

Last Updated 05/19/2022 11:40 AM
Project Title

Preventive and Critical Lining, Phase 2

Physical Address View project details and contacts
City, State (County) Denver, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,700,000 to $2,050,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate approximately 57,744 linear feet of deteriorated sewer pipes in the City and County of Denver using Cured-in-Place-Pipe (CIPP), a trenchless technology. CIPP methods allow for significantly shorter construction time in comparison to open trench methods of construction. Since no excavation is required, utilities and traffic conflicts are minimized. The majority of pipes lined in this project are located in City Council Districts 1 and 3 with minor work in Districts 2, 7, 9 and 10.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents