Similar Projects
Starling Development - Phase 3
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Kalispell, MT 59901

Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 CJ est. value
Bozeman, MT 59715

The Charles Hotel - Compass Construction
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

Phase 1 Collection System Rehabilitation
Infrastructure
Design
$1,950,000 CJ est. value
Glendive, MT 59330

2022 North 7th Avenue Water Renovations
Infrastructure
Bidding
$450,000 CJ est. value
Bozeman, MT 59715

2022 North 7th Avenue Water Renovations
Infrastructure
Bidding
$450,000 CJ est. value
Bozeman, MT 59715

Bozeman Public Library
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$4,500,000 CJ est. value
Bozeman, MT 59715

Lone Pine State Park Water System Improvements
Infrastructure
Post-Bid
$145,200 est. value
Kalispell, MT 59901

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Spokane Avenue Water Main Replacement Project
Infrastructure
Results
Whitefish, MT 59937

Joint City-County Law and Justice Center - Gallatin County and City of Bozeman
New Construction, Renovation, Infrastructure
Construction
$29,000,000 CJ est. value
Bozeman, MT 59715

2022 Street Improvement Project
Infrastructure
Construction
$615,307 CJ est. value
Lewistown, MT 59457

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Creekside Commons
New Construction, Infrastructure
Pending Verification
$13,579,200 CJ est. value
Kalispell, MT 59901

Water Mains With Fowler Corridor Street Improvements - WIF58 - City of Bozeman
Infrastructure
Conception
$900,000 est. value
Bozeman, MT 59718

Last Updated 10/26/2022 12:35 AM
Project Title

Emergency Shelter Trailers Sewer System

Physical Address View project details and contacts
City, State (County) Box Elder, MT 59520   (Chouteau County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work is needed for the sewer system for the Three Emergency Shelter Trailers for the Office of Victim Services, located by the Rocky Boy Police Department on Upper Box Elder Road. The scope of work will include but is not limited to: Completing the Installation of Sewer Service: o480' of 4" Sewer Pipe o80' of 3" SCH40 PVC o40' of 2" SCH40 PVC oCore 4" Pipe into Sewer Manhole oFour (4) 3"x3"x2" WYE oFour (4) 2" 45 DWV oFour (4) 4"x3" Coupling Sewer Drains oTen (10) 4" 45 Sewer and Drain oTen (10) 4" 90 Sewer and Drain The selected Contractor will be responsible for all material needed for each phase of this project. All workmanship shall be completed in a professional manner. Contractor will supply all labor associated with this project. Contractor will work closely and be approved by the TWRD Wastewater Operator. Please contact Florence Standing Rock or Kaycee Henry before submitting bid to clarify any questions or concerns. Bidders are encouraged to inspect Emergency Shelter homes before submitting a bid. The Chippewa Cree Tribe reserves the right to negotiate final contractual terms and project specifications with the awarded respondent. For more information, please call Florence Standing Rock or Kaycee Henry at 406-395-5060 ext. 6631 or 6633. They can also be reached at flo@chippewa-cree.org or kaycee@chippewa-cree.org. 2. Bidding Requirements 3. Bidder Information - name, address, telephone, and website (if available). Include the name, title, and e-mail address of the individual who will serve as the primary contact. Include a brief description and history of your firm. 4. Project Approach - please explain your project approach, style, and process. If you have worked with the Chippewa Cree Tribe in the past, please specify which projects. 5. Fixed Price - must include a fixed cost for all work-related tasks and deliverables outlined in the submitted bid. TERO Fees included. 6. Business License and TERO Fees - TERO Fees, TERO Business License, and TERO Work Permit may be applicable. Please speak to project coordinator listed above regarding the inclusion of TERO Fees in your bid. 7. All Contractors should provide the following insurance: Bonding, Worker's Compensation, General Liability Insurance.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents