Similar Projects
Spruce Street Culvert Replacements
Infrastructure
Post-Bid
Frackville, PA 17931

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2020 Storm Sewer Improvements Project
Results
Auburn, PA 17922

2020 Storm Sewer Replacement Project
Results
Cressona, PA 17929

Construction of the North Warren Street to Long Avenue Sewer Replacement Project
Results
$800,000 est. value
Orwigsburg, PA

Sewer Rehabilitation and I/I Repairs - Locust Lake State Park
Results
$100,000 to $500,000 est. value
Barnesville, PA 18214

Wood Street Sewer Replacement
Results
$265,000 est. value
Ringtown, PA 17967

Water Distribution System Improvements
Results
$1,000,000 to $5,000,000 est. value
Pottsville, PA

Main and Centre Valve Replacement Project
Results
$150,000 est. value
Mahanoy City, PA 17948

Mountain Road Water Main Replacement
Results
$575,000 est. value
Pottsville, PA 17901

Collection System Rehabilitation Project
Results
$330,000 est. value
Orwigsburg, PA

Sunbury Street Storm Sewer Project
Infrastructure
Results
Minersville, PA 17954

Lead Water Service Line Replacement (2021)
Infrastructure
Results
$550,000 est. value
Schuylkill Haven, PA

Water Meter Pit Repairs
Infrastructure
Results
Pottsville, PA

2021 Peach Street Storm Water Project
Infrastructure
Results
$25,000 est. value
Pine Grove, PA 17963

Last Updated 02/21/2022 11:57 AM
Project Title

Pine Street Main Replacement Projects

Physical Address View project details and contacts
City, State (County) Minersville, PA 17954   (Schuylkill County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project is the replacement of approximately 550 LF of 8-inch and 15-inch PVC sanitary sewer main, 760 lf of 8-inch DI water main, and 275 linear feet of 12-inch SLCPP storm sewer main on Pine Street from Third Street to Carbon Street. The project includes replacing the sanitary mains, sanitary manholes, storm lines, storm manholes, inlets, water mains and services as indicated on the project drawings.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents