Similar Projects
South Palm and Hornet Ditch Drainage Improvements Project FY22
Infrastructure
Bidding
$400,000 est. value
GA

290 Batesville Road Stormwater Project
Infrastructure
Bidding
$700,000 est. value
Milton, GA 30004

Site Pavement and Erosion Repair
Post-Bid
Savannah, GA

North 4Th Avenue Drainage And Sidewalk Improvements
Post-Bid
Rome, GA

Knight Road Culvert Replacement
Results
Rutledge, GA 30663

Pike County CDBG19 - Storm Drainage and Street Improvements, Hill Top Community
Results
Less than $515,000 est. value
Zebulon, GA 30295

2020 CDBG Street and Storm Drainage Improvements
Infrastructure
Bidding
$600,000 est. value
Eatonton, GA

Terminal Area Expansion Grading and Drainage Phase 1A
Post-Bid
Dallas, GA 30157

Irwin County 2020 LMIG Mcneil Drive
Results
Less than $79,977 est. value
GA

Uplands Requirement
Alteration
Bidding
$1,000,000 to $6,000,000 est. value
Fort Stewart, GA 31314

Public Work Services
Post-Bid
Brookhaven, GA

Little Buffalo Creek Road
Results
Hickox, GA 31553

SR 124 / Scenic Highway at Jackson Street / New Hop
Term Contract
Bidding
Lawrenceville, GA

SHEP Sediment Basin Rock Weir and Fill Design
Term Contract
Post-Bid
$25,000,000 to $50,000,000 est. value
Savannah, GA

Drainage Improvements
Results
Luthersville, GA 30251

Last Updated 05/24/2022 03:00 AM
Project Title

8845 N. River Park Drainage Improvement

Physical Address View project details and contacts
City, State (County) Sandy Springs, GA   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the construction of three proposed drainage structures, one replaced catch basin top, and approximately 227 LF of proposed storm drain at the intersection of N. River Pkwy and Winding River Rd in Sandy Springs, Georgia. The project also includes a drainage ditch to be constructed over the proposed pipes, and a rip rap apron at the outfall of an existing headwall.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents