Similar Projects
Y--Zion-New Water System at Kolob Canyons
Design
$1,000,000 to $5,000,000 est. value
Denver, CO

Water Treatment Process Tank and Apparatus Repair
Bidding
Arvada, CO

Rolling Hills 2 MG Potable Water Tank
New Construction
Bidding
Less than $2,400,000 est. value
Colorado Springs, CO

H--Water Tank Testing Services - 554
Post-Bid
Aurora, CO 80045

H--Water Tank Testing Services - 554
Post-Bid
Aurora, CO 80045

SCWTP Backwash Tank Improvements
Results
Less than $200,000 est. value
Louisville, CO 80027

Saint Vrain Hub Chilled Water System
Results
Longmont, CO 80501

Apex Center Domestic Hot Water Storage Tank Replacement
Construction
Arvada, CO 80005

Rehabilitation of Two 2-MG Drinking Water Storage Tanks
Bidding
Cortez, CO

H--Water Tank Testing Services - 554
Post-Bid
Aurora, CO 80045

29Th Street 5.5 Mg D115 Water Storage Tank
Results
Loveland, CO 80537

ERWSD & UERWA Water Storage Tank and Booster Pump Stations Hatch Improvements
Bidding
Vail, CO

12000 Gallon Vertical Fiberglass Storage Tank
Post-Bid
CO

J--MEVE (CM) Replace GAC Water Plant
Results
Lakewood, CO

Prequalification: Price Park Tank Replacement
Bidding
Longmont, CO

Reported 01/05/2021 12:00 AM
Project Title

Moraine Park Campground and HQ Utilities

Physical Address View project details and contacts
City, State (County) Grand Lake, CO   (Grand County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is a design-build construction that will rehabilitate the Headquarters East water system which includes the Moraine Park Campground (MPCG) water distribution systems. The Park Headquarters East Water System and MPCG provides camping opportunities and potable water and fire flows/storage for campers staying at the 244 summer and 77 winter campsites, five comfort stations, ranger station, concessionaire-operated livery, park seasonal quarters, and private in-holder residence. The majority of the existing water distribution system and water storage tanks were installed in 1965 and are well past the components typical service life of 30 years. Repairs to the existing galvanized steel and cast-iron distribution at Moraine Park have become more frequent. The waterlines and components of the Moraine Park Water System are in very poor condition, primarily due to age and deferred maintenance. Several portions of the system are not buried to the appropriate depth and are thus subject to freezing and require monitoring to prevent problems.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents