Similar Projects
CDC Atlanta and Chamblee Flooring
Term Contract, Alteration
Design
$1,000,000 to $5,000,000 est. value
Atlanta, GA 30333

Gymnasium Floor Screening and Refinishing
Term Contract
Bidding
Savannah, GA

Floor Stripping and Waxing
Alteration
Bidding
Cedartown, GA

Removal, Installation of New Flooring at Hearthsto Lodge
Post-Bid
Cumming, GA 30040

Carpet and Flooring Installation
Post-Bid
Atlanta, GA

78--Rubber Gym Flooring
Results
Fort Benning, GA 31905

Install Epoxy Floor Covering
Results
Moody AFB, GA 31699

Floor Covering
Alteration
Bidding
Newnan, GA 30265

Floor Covering Replacement for the City Of Dalton Public Works Administrative Building and City Hall
Post-Bid
Dalton, GA 30721

Gym Floor Replacement At Myers Middle School And Shuman (Esplost) Elementary School
Results
Savannah, GA 31400

Removal and Installation of Flooring at Magistrate Court and Property and Evidence
Alteration
Bidding
Cumming, GA 30040

Pete Liakakis Building Floor Repair
Term Contract
Post-Bid
GA

Mount Airy Post Office Floor
Results
Mount Airy, GA 30563

Painting and Flooring
Post-Bid
Demorest, GA 30535

Freedom Park K-8 Media Center Flooring
Alteration
Results
Augusta, GA 30905

Reported 04/12/2022 03:49 PM
Project Title

Public Defenders Foundation Repairs

Physical Address View project details and contacts
City, State (County) Woodbine, GA 31569   (Camden County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To stabilize the foundation and install a moisture barrier system at the property located at 401 Georgia Ave. Woodbine, Ga. 31569. The scope of work includes: site preparation, sister the existing joists, install supplemental beams and a floor stabilizing/lifting system to adequately support and lift the floor back to grade, install a moisture barrier system, and remove any construction debris. The moisture barrier system will contain, at a minimum, approx. 1500 sqft of CleanSpace material, approx. 1500 sqft of drainage matting, an access door, seal current crawl space vents, 1 SmartSump, and 1 SaniDry Sedona dehumidifier or equivalent.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents