Similar Projects
Renovations to the Don Ellis Building
New Construction, Renovation - 7,000 SF
Design
Less than $1,000,000 est. value
Raleigh, NC 27616

Eastern Wake Site Public Safety Simulation Complex
- 80,000 SF
Design
Less than $32,700,000 est. value
Raleigh, NC 27600

NCSU - Ricks Hall 2nd Floor Renovations
Renovation
Bidding
$8,500,000 est. value
Raleigh, NC 27607

Lab and Building Systems Renovations to Varsity Research Building
Renovation - 15,200 SF
Post-Bid
Raleigh, NC 27606

Project Management Services for Roberts Science Center Renovation Project
Renovation - 12,600 SF
Post-Bid
Raleigh, NC 27601

Dabney Hall Evaluation and Upgrade Phase 2 METRIC Renovation
Renovation
Results
Raleigh, NC

Elevator Additions - Tucker and Owen Residence Halls
Results
$1,400,000 est. value
Raleigh, NC 27695

Design Build for Restoration of Memorial Belltower
Construction
Less than $6,100,000 est. value
Raleigh, NC

Tupper Memorial Hall Renovation
Renovation - 15,000 SF
Construction
$211,430 est. value
Raleigh, NC 27601

Integrative Sciences Building
New Construction
Design
$160,000,000 est. value
Raleigh, NC 27695

Suite 520/517 Renovations - Poe Hall
Renovation
Post-Bid
Raleigh, NC

Renovations to the Don Ellis Building
Renovation - 7,000 SF
Results
Less than $1,000,000 est. value
Raleigh, NC

New Engineering Building
New Construction - 49,144 SF
Construction
Less than $11,574,200 est. value
Raleigh, NC 27600

NCSU Electrical Distribution
Renovation
Post-Bid
$47,211,000 est. value
Raleigh, NC

Renovations to Data Center II
Renovation
Results
Less than $6,500,000 est. value
Raleigh, NC 27695

Last Updated 09/30/2021 09:05 AM
Project Title

Eastern Wake Site and Central Energy

Physical Address View project details and contacts
City, State (County) Wendell, NC 27591   (Wake County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced October 2021, Sitework Commenced October 2021, Vertical Construction Start Expected November 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

BP 01A: General Trades BP 01B: Temporary Fencing BP 03A: Building Concrete BP 05A: Structural Steel BP 31B: Earthwork, Sitework, Grading BP 31C: Paving BP 31E: Site Concrete BP 33A: Site Utilities BP 33B: Underground Mechanical Piping BP 33C: Geothermal System BP 33D: Combo (BP's 31B, 31C, and 33A) *SUB-BIDDING 9/23/21 at 3:00 PM BP 01F: Final Cleaning BP 09E: Acoustical Ceilings BP 04A: Masonry BP 09G: Painting BP 05B: Misc. Metals BP 10A: Specialties BP 06B: Architectural Casework BP 10D: Signage BP 07A: Roofing BP 12A: Window Treatments BP 07B: Waterproofing BP 21A: Fire Suppression BP 07F: Wall Panels, Screens, Grilles BP 22A: Plumbing BP 08A: Doors, Frames, Hardware BP 23A: Mechanical BP 08D: Curtainwall, Storefront, Glazing BP 26A: Electrical BP 08F: OH Doors BP 31D: Unit Paving BP 09A: Drywall Assemblies BP 32A: Landscaping, Planting, Irrigation BP 09C: Flooring BP 32B: Site Furnishings *PREFERRED BRAND ALTERNATES Site Furnishings: Bench - Victor-Stanley Model # RB-28 & RB-12, Trash/Recycling Victor-Stanley Model #SD-45 with rain bonnet lid. Site Lights: Pedestrian - Ligman UVA-20001, Solar Pole Sonaray Sunbrite SR-3080-D Door Hardware: Schlage Everest/Primus FSIC (Full Sized Interchangeable Core), Schlage L9000 Series Mortise Lockset, LCN 4040XP Door Closers, LCN Senior Swing ADA Door Operator UPS and Equipment: Eaton 9300 Series, Temperature and humidity probe Electrical Meters: AccuEnergy AcuPanel 9100 Series Access Control Panel: iStar with the C-Cure 9000 software package by Software House Incorporated. Security System: Salient Telecommunications Equipment: Rack - Chatsworth two post 19-inch Part No. 55053-70, Jacks - Hubbell Part No. HXJ6BK, Dual Sided Horizontal Cable Management - 2 RU Panduit WMP1E, Vertical Wire Management - Panduit WMPVHC45E, Enclosed Server Cabinet - APC E242296 AV Control Equipment: Extron Control Systems Electrical Meters: Acuvim II and BACnet card Chiller and Associated Equipment: Carrier or Multistack Should you wish to attend the Preferred Brand Alternates meeting, and are not a prequalified subcontractor for this project, please contact Jason Tobias at Jason.tobias@skanska.com

Details

College/University, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents