Similar Projects
Piping Replacement at AMP 113
Renovation
Post-Bid
Oklahoma City, OK 73112

Oklahoma Community College Hands Free Fixture Upgrade
Alteration
Post-Bid
Oklahoma City, OK 73159

Plumbing Maintenance and Repair Services for City Owned Facilities
Term Contract
Results
Stillwater, OK

Courthouse Water Fountain Project
Alteration
Results
Oklahoma City, OK 73102

Hot Tub Replacement
Alteration
Post-Bid
Oklahoma City, OK

Site and Building
Infrastructure, Alteration
Results
Norman, OK

Piping Repair and Replacement Services
Alteration
Post-Bid
Norman, OK

Plumbing and Gas Line Repair
Alteration
Results
$300,000 est. value
Oklahoma City, OK

Plumbing Repair and Maintenance Services for Interior and Exterior
Alteration
Post-Bid
$30,000 est. value
Oklahoma City, OK

Installation of Insertion Valves Ranging
Alteration
Results
$90,000 est. value
McAlester, OK

Plumbing Contractor 2022-2023
Alteration
Post-Bid
Muskogee, OK

Fiberglass Bulk Chemical Tank Repair at Mohawk Water Treatment Plant
Infrastructure
Results
$63,673 CJ est. value
Tulsa, OK 74115

On Call Plumbing Repairs
Term Contract
Post-Bid
Oklahoma City, OK 73102

Automated Meter System (Electric and Water)
Renovation
Results
$2,098,284 CJ est. value
Blackwell, OK 74631

Cherokee County Livestock Arena - 22A - Building Plumbing
Alteration
Post-Bid
$50,000 est. value
Tahlequah, OK 74464

Last Updated 02/10/2023 09:31 PM
Project Title

CHIC 313113 - Pavement Improvements

Physical Address View project details and contacts
City, State (County) Sulphur, OK 73086   (Murray County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

CHIC 313113 - Pavement Improvements - Solicitation, Chickasaw National Recreation Area a) This acquisition is being conducted with a Total Small Business set aside. The North American Industrial Classification System (NAICS) code and the associated small business size standard are noted in clause 52.204-8 in section "K" of this solicitation. b) Estimated Price Range: Between $5,000,000 and $10,000,000 per FAR 36.204 c) Refer to section "L" for information regarding a pre-proposal site visit. d) Information and requirements stated in sections "B" through "J" & attachments noted in section "J" apply to this solicitation and the subsequent contract. e) Refer to section "L" for proposal submittal requirements. f) This is currently an unfunded requirement with a high expectation that funds will be available. When and if funds become available a contract will be awarded at that time. g) Offerors shall submit proposals and questions, and acknowledge solicitation amendments as stated in section "L" of this solicitation CHIC 313113 - Pavement Improvements NPS PM/COR: Darin Thacker NPS PS/COR: Jennifer Baker NPS CO: Jeremiah Rogers NPS CS: Tyler Joseph *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work of this contract is for the construction and preservation of roads within Chickasaw National Recreation Area. Project Location: Pavement preservation project located in the Chickasaw National Recreational Area (CHIC), along Point Road (Rt. 0013AZ), Point Campground Road (Rt. 0204), Point Campground Road loop roads (Rt 0204), Buckhorn Road (Rt. 0011), and Cedar Blue Entrance Road (Rt. 0100), Sulphur, Murray County, Oklahoma. Reference the drawings for the exact location of the project area. The Work includes rehabilitation of paving surfaces, including but not limited to; mill and overlay of failing pavement, asphalt removal, transition mill, aggregate topsoil shoulder work and shoulder grading, aggregate topsoil aprons and areas, full or partial depth patching as necessary, utility structures are to be protected or reset when necessary, remove and replace concrete headwall and RCP culvert, addition of geotechnical fabric, striping and other pavement markings, snow plowable raised pavement markers, remove and replace loop sensors, new loop sensors, replacement of MUTCD sign panels (not posts), drainage swales, and in addition to the specified erosion, tree and traffic control measures, the Contractor is to provide and advertise the work on a variable message signs. Reference the contract documents for the full project scope Pre-proposal questions shall be submitted a minimum of 7 days prior to the due date and time for proposals. Submit questions only though email to both of the following: Contracting Officer, Jeremiah Rogers, jeremiah.rogers@nps.gov Contract Specialist, Tyler Joseph, tyler_joseph@contractor.nps.gov

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents