Similar Projects
Southern Oaks
New Construction
Conception
Narcoossee, Saint Cloud, FL 34771

Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

Design-Build Floating Day Dock and Dinghy Dock
Bidding
Bradenton Beach, FL 34217

Mole Pier Boat Wash Facility
Bidding
Key West, FL

Rebuild UPH STA Ponce de Leon Inlet, New Smyrna Beach, FL
Post-Bid
$100,000 to $6,000,000 est. value
New Smyrna Beach, FL 32168

DeSoto Park ADA Floating Kayak Launch
Post-Bid
Satellite Beach, FL 32937

Design-Build Construction Delivery Method for New Fire Stations
New Construction - 17,250 SF
Results
Jacksonville, FL

Carl Gray Park Boat Ramp Improvements
Results
$250,000 est. value
Panama City, FL

The Harbour in Historic Coconut Grove
New Construction, Renovation - 112,200 SF
Construction
$17,900,000 est. value
Coconut Grove, FL

North Cargo Berth 8 Extension
Construction
Less than $8,000,000 est. value
Cape Canaveral, FL 32920

Oscar Scherer State Park - Lake Osprey Fishing Pier
Bidding
Osprey, FL 34229

Removal, Derelict Marine Vessels
Post-Bid
Less than $50,000 est. value
Tampa, FL 33601

Repair Waterfront and Storm Sewer Systems at U.S. Coast Guard Station Panama City, FL
Results
$500,000 to $1,000,000 est. value
Panama City, FL 32408

St. Mary’s Cove Boat Ramp Phase 1
Bidding
Macclenny, FL

Longwood/Poquito Bayou Park Dock Extension
Post-Bid
Shalimar, FL 32579

Last Updated 04/20/2021 11:57 PM
Project Title

Seaside Park Beach Walkway Improvements

Physical Address View project details and contacts
City, State (County) Fernandina Beach, FL 32034   (Nassau County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all tools, labor, materials, equipment, and supervision for selective demolition of the existing timber walkway, and construction of a new 100 linear feet of timber pile supported timber walkway with handrails extending over the existing dune field with a new 150 linear feet of new access ramp to the beach area. Included will be the construction of the connection of the new walkway to the existing walkway at the location where the existing walkway was removed. Work is to be performed in a manner to not cause disturbance or adverse impacts to the existing dunes or dune vegetation.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents