Similar Projects
Shared-Use Paths, and Sidewalks
Infrastructure
Conception
Moline, IL

Arby's
New Construction - 2,300 SF
Design
$500,000 to $1,000,000 CJ est. value
Henry, IL

CPS Carver ES, Dubois ES & Metcalfe ES ADA
Infrastructure
Bidding
Chicago, IL 60628

Expansion of Center for Agrarian Learning Student Farm - Landscaping Services
Infrastructure
Bidding
Crystal Lake, IL 60012

Emergency Traffic Signal Cabinet Repurpose
Post-Bid
Oak Park, IL 60302

Lot Repairs at Champaign Sign Shop
Post-Bid
Champaign, IL 61820

Construction of a Pedestrian Bridge on Bryn Mawr Avenue over the Des Plaines River in Rosemont
Results
IL

Construct A Pedestrian Underpass From Burlington Avenue, Through the BNSF Railway Embankment
Results
Western Springs, IL 60558

Cooper`s Hawk Winery & Restaurant
New Construction
Pending Verification
Gurnee, IL 60031

2022-2026 Traffic Signal Maintenance
Term Contract
Bidding
Elgin, IL

County Line Road: I-294 Ramp to North Avenue
Post-Bid
IL

Sidewalk and Pedestrian Crossing Improvements on West Main Street From Cary-Algonquin Road to Wulff Street in Cary
Results
Cary, IL 60013

Haskell School Parking Lot Replacement
Post-Bid
Rockford, IL 61103

Greenfield Park Pathway Improvements
Results
Northbrook, IL 60062

2021 District Wide Emulsion-Based Parking Lot and Trail Sealcoating
Post-Bid
Naperville, IL

Reported 11/06/2021 12:00 AM
Project Title

Effingham Bike Path Pavement Marking and Signage

Physical Address View project details and contacts
City, State (County) Effingham, IL 62401   (Effingham County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Trailhead, parking, and sidewalk crossing improvements, construction of a pedestrian path and signage at various locations along Outer Belt West in Effingham. The project will involve a Trailhead/parking improvements to be made at along Outer Belt West between Fayette and Evergreen. Sidewalk crossing improvements to connect trails at the intersection of Keller Drive and Evergreen/I57 Offramp. Other improvements will include signage and striping improvements along 4th Street/Hoffman Dr., Evergreen (East), Maple Street, Temple Ave, Willow St, Virginia St, Section St, Washington Ave, St. Anthony Ave, Grove Ave, Sherman St., and Wabash Ave. As well as minor improvements at intersections. District 7 Construction Funds.

Details

Division 10 - Specialties, Signage, Tactile Signage.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents