Similar Projects
Chiller Maintenance
Term Contract
Bidding
Hanscom A F B, MA

J045--Duct Cleaning Service
Term Contract
Bidding
Bedford, MA 01730

Cheney Middle School Solar Array
Post-Bid
Belmont, MA 02478

Replace HVAC Compressor Brigade HQ Building
Post-Bid
Less than $15,000 est. value
Hanscom A F B, MA

HVAC Maintenance and Repair Services
Results
Natick, MA 01760

Highland Parkway HVAC and Cupola Renovations - General Bid
Results
$310,000 est. value
Lowell, MA 01854

Stand Alone AC Unit Maintenance
Term Contract
Bidding
Hanscom A F B, MA

Weatherization Assistance Program
Post-Bid
Framingham, MA

Rehabilitate Visitor Center HVAC System, LOWE
Results
$500,000 to $1,000,000 est. value
Lowell, MA

Saltonstall Building RTU Removal and Replacement
Alteration
Bidding
$15,000 est. value
Medford, MA 02155

Variable Capacity, Heat Pump Heat Recovery Air Conditioning System
Post-Bid
Hudson, MA 01749

Central Acton Water Treatment Plant Contract 1 - Filed Sub-Bids
Results
$6,800,000 est. value
Acton, MA 01720

On-Call HVAC Controls Repairs and Inspections
Alteration
Bidding
Reading, MA

HVAC Replacement
Post-Bid
Less than $150,000 est. value
Framingham, MA 01702

Miracle Field Sports Pavilion - Filed Sub-Bids
Results
Less than $900,000 est. value
Acton, MA 01720

Reported 07/23/2021 12:00 AM
Project Title

Preventive Maintenance, Inspection, Startup, Shut Down and Repair of Tewksbury Hospital Chiller Systems

Physical Address View project details and contacts
City, State (County) Tewksbury, MA 01876   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from Municipal Agency - 07/07/21
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Preventive Maintenance, Inspection, startup, shut down and repair of Tewksbury HospitalĀ¶s Chiller Systems. The work will include complete inspections of the existing systems, seasonal startup and shut down of the chiller plant and preventative maintenance of all the systems associated with the chiller system. Contractor should be certified in the repair and maintenance of York absorbers and associated equipment

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents