Similar Projects
Express Design- Build - Construct Multiple Bridges in Division 11
Bidding

Express Design- Build - Construct Multiple Bridges in Division 11
Bidding

Replacement of Roughly 10 Structures
Post-Bid

Replacement of Roughly 10 Structures
Post-Bid

Ballinger Road Bridge Replacement
Results
Greensboro, NC

Repairs on Four Bridge Locations
Results
Raleigh, NC

Sewer Force Main Suspension Bridge Assessment and Repair - Design-Build
Renovation
Construction
Cherokee, NC 28719

Lakeview Drive Bridge
Post-Bid
Less than $250,000 est. value
Whispering Pines, NC 28327

PN 91252 Pedestrian Bridge
Results
$1,000,000 to $5,000,000 est. value
Fort Bragg, NC 28307

2020 Bridge Hydro-Demo Project
Post-Bid
Raleigh, NC 27604

Construction of the Walker Branch Greenway (South Tryon to Smith Road)
Results
Charlotte, NC 28273

Plymouth Subdivision Bridge Repairs
Renovation
Post-Bid
Aurora, NC 27808

Stith-Talbert Pedestrian Bridge Repairs
Results
Rocky Mount, NC

Plymouth Subdivision Bridge #125.50 Repair
Renovation
Post-Bid
Washington, NC 19348

Sykes Pond Road Bridge Replacement
Results
Less than $1,147,819 est. value
Fayetteville, NC

Last Updated 07/28/2020 08:33 AM
Project Title

Hurricane Florence Recovery Milcon Package 4

Physical Address View project details and contacts
City, State (County) Camp Lejeune, NC   (Onslow County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000,000 to $250,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: This solicitation will result in a firm-fixed price (FFP) contract for design-build (DB) construction services. This Package include the following MILCON Projects: P1387 - Onslow Beach Bridge: Constructs a moveable bridge across the Intracoastal Waterway. This project also includes new approach roads, bridge abutments, guardrail, lighting, asphalt pavement, and demolition of the existing bridge. P1505 - Railroad Trestle Replacement: Replaces the 2,500 linear foot White Oak River Trestle and 60 linear foot Queens Creek Trestle. Construction includes new trestles, bridge abutments, track ballast, railroad ties, and earthwork and grading.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents