Similar Projects
International Trade Center (ITC) Fourth Floor Renovations - Demolition Phase
Demolition, Infrastructure
Sub-Bidding
$400,000 CJ est. value
Mobile, AL 36602

McDuffie Beach House Demolition
Demolition, Infrastructure
Sub-Bidding
$300,000 CJ est. value
Mobile, AL 36602

Asbestos Abatement and Demolition and Clearance
Term Contract, Demolition, Infrastructure
Post-Bid
$34,800 CJ est. value
Prichard, AL 36610

Nuisance Abatement - Demolition of Structures at 164 Hemley Avenue
Demolition, Alteration
Post-Bid
Mobile, AL 36607

Woodlawn Apartments - Asbestos Abatement and Demolition
Demolition, Alteration
Results
$448,750 est. value
Mobile, AL 36605

Nuisance Abatement - Demoltion - Metal Storage Shed at 4241 Furman Drive
Demolition, Alteration
Results
Mobile, AL 36619

Nuisance Abatement - Demolition of Structures at 1712 Dog River Drive East
Demolition, Alteration
Post-Bid
Mobile, AL 36605

Nuisance Abatement - Demolition of Structure at 56 South Lafayette Street
Demolition, Alteration
Results
Mobile, AL 36604

Nuisance Abatement - Demolition of Structures at 7426 F/K/A 7412 Fourth Street
Demolition, Alteration
Post-Bid
Mobile, AL 36608

Nuisance Abatement - Demolition of Structure at 354 Dunbar Street
Demolition, Infrastructure
Results
Mobile, AL 36603

Nuisance Abatement - Demolition of Structures at 657 Donald Street
Demolition, Alteration
Post-Bid
Mobile, AL 36617

Nuisance Abatement - Demolition of Structure at 724 Kentucky Street
Demolition, Alteration
Results
Mobile, AL 36603

Nuisance Abatement - Demolition of Structure at 1652 Wexford Street
Demolition, Alteration
Post-Bid
Mobile, AL 36605

Nuisance Abatement - Demolition of Structure at 1479 Navco Road
Demolition, Alteration
Results
Mobile, AL 36605

Nuisance Abatement - Demolition of Structure at 7320 F/K/A 7312 Fourth Street
Demolition, Alteration
Post-Bid
Mobile, AL 36608

Last Updated 12/29/2022 02:36 AM
Project Title

Government Plaza - Tenth Floor Signage

Physical Address View project details and contacts
City, State (County) Mobile, AL 36602   (Mobile County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $10,474 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Include the furnishing of all labor, materials, tools and equipment necessary to carefully remove existing temporary signage and provide and install new ADA Interior Signage A Cashier's Check drawn on an Alabama bank or Bid Bond payable to Owner, City of Mobile, in the amount of 5% of the Base Bid, but in no event more than $10,000.00 is required to accompany Bid For contracts that exceed $10,000.00, a Bid Bond (or Bid Security), Performance Bond and a Labor and Material Payment Bond shall be required All work operations shall take place in the identified areas during the week, and during designated weekends if agreed upon in advance. Debris shall be removed from the site at the end of each work day. Adjacent surfaces and hallway areas shall be protected and kept dirt/debris free for the duration of the project. Thoroughly clean these areas at the end of each work day. Contractor shall coordinate all work sequences with the Project Manager and end-user representative to minimize disruption of employee work activities. Quoters are required to participate in the Pre-Quote Conference, visit the site prior to submitting a Quote, and include all costs associated with the project in their Quotes. This project is tax exempt. Summary of Work: Include the furnishing of all labor, materials, tools and equipment necessary to carefully remove existing temporary signage and provide and install new ADA Interior Signage as outlined in this RFQ document. All work operations shall take place in the identified areas during the week, and during designated weekends if agreed upon in advance. Debris shall be removed from the site at the end of each work day. Adjacent surfaces and hallway areas shall be protected and kept dirt/debris free for the duration of the project. Thoroughly clean these areas at the end of each work day. Contractor shall coordinate all work sequences with the Project Manager and end-user representative to minimize disruption of employee work activities.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.
Division 09 - Finishes.
Division 10 - Specialties, Signage.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents