Similar Projects
Overland Park Arboretum Nature Trail - City of Overland Park
Infrastructure
Conception
$3,050,000 est. value
Bucyrus, KS 66013

159 Lone Elm Industrial Development
New Construction - 640,150 SF
Design
$10,000,000 CJ est. value
Olathe, KS 66062

Sun Motorsport Garage
New Construction - 9,850 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Shawnee, KS 66218

RFQ Engineering - 2022 Playground Replacement Projects
Infrastructure
Bidding
$350,000 CJ est. value
Overland Park, KS 66204

RFP Engineering - Engineering Services for the Sanitary Sewer Collection System
Infrastructure
Bidding
$2,000,000 CJ est. value
Olathe, KS 66061

Bob Allen Ford Fleet Center
New Construction, Infrastructure - 16,687 SF
Post-Bid
$10,000,000 CJ est. value
Overland Park, KS 66212

Turkey and Brush Creek 2-D Modeling Project
Infrastructure
Post-Bid
Olathe, KS 66061

Farmers' Market Pavilion Site
Infrastructure
Results
Overland Park, KS

2022 Crack Seal Program (MR-2720)
Infrastructure
Results
$897,308 CJ est. value
Overland Park, KS 66204

175Th Commerce Centre
New Construction - 1,066,240 SF
Pending Verification
$10,000,000 CJ est. value
Olathe, KS

Boulder Springs IV
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Spring Hill, KS 66083

Maranatha Academy
New Construction, Infrastructure - 130,000 SF
Design
$28,000,000 CJ est. value
Shawnee, KS 66203

Barton Street - 60th Street to 59th Terrace - Construction
Infrastructure
Bidding
$293,000 CJ est. value
Shawnee, KS 66203

Tesla Automotive Repair Facility
New Construction, Infrastructure - 35,816 SF
Post-Bid
$9,000,000 CJ est. value
Lenexa, KS 66219

87th Street and Antioch Road Traffic Signal Reconstruction
Infrastructure
Results
$552,375 CJ est. value
Overland Park, KS 66212

Last Updated 08/10/2022 04:01 PM
Project Title

Artio Medical

Physical Address View project details and contacts
City, State (County) Olathe, KS 66061   (Johnson County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $80,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of two commercial manufacturing buildings with the potential of an adjacent third facility. As of August 10, 2022, this project has received plan approval from the City of Olathe, however, a building permit has not been issued. Information regarding the architect and general contractor has not been released. A firm timeline for construction has not been released.

Details

150,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents